Laserfiche WebLink
31 2104.502 REMOVE CASTING (STORM)EA $250.00 2 $500.00 <br />32 2104.602 REMOVE CONE SECTION EA $1,000.00 1 $1,000.00 <br />33 2501.503 12" RC PIPE SEWER DESIGN 3006 CLASS V LF $70.00 235 $16,450.00 <br />34 2503.602 CONNECT TO EXISTING STORM SEWER EA $1,000.00 2 $2,000.00 <br />35 2506.502 CASTING ASSEMBLY (STORM)EA $1,000.00 2 $2,000.00 <br />36 2506.502 CONSTRUCT DRAINAGE STRUCTURE DES 48-4020 EA $5,000.00 1 $5,000.00 <br />37 2506.502 CONSTRUCT DRAINAGE STRUCTURE DES 60-4020 EA $6,000.00 1 $6,000.00 <br />38 2506.502 CONSTRUCT DRAINAGE STRUCTURE DES SPECIAL EA $3,500.00 2 $7,000.00 <br />39 2506.602 CONE FOR EXISTING 48-4020 STRUCTURE EA $3,000.00 1 $3,000.00 <br />$42,950.00 <br />$6,442.50 <br />$49,392.50 <br />$12,348.13 <br />$61,740.63 <br />40 2504.602 BOLT REPLACEMENT - HYDRANT EA $1,500.00 1 $1,500.00 <br />41 2504.602 BOLT AND VALVE BOX REPLACEMENT - VALVE EA $4,000.00 2 $8,000.00 <br />$9,500.00 <br />$1,425.00 <br />$10,925.00 <br />$2,731.25 <br />$13,656.25 <br />42 2104.502 REMOVE FRAME AND RING CASTING (SANITARY)EA $250.00 3 $750.00 <br />43 2504.602 CASTING ASSEMBLY (SANITARY)EA $1,000.00 3 $3,000.00 <br />44 2506.602 ADJUST FRAME & RING CASTING W/ INFI SHIELD (SANITARY)EA $850.00 3 $2,550.00 <br />$6,300.00 <br />$945.00 <br />$7,245.00 <br />$1,811.25 <br />$9,056.25 <br />CONSTRUCTION SUBTOTAL:$287,590.00 <br />15% CONTINGENCY:$43,138.50 <br />CONSTRUCTION TOTAL:$330,728.50 <br />25% INDIRECT:$82,682.13 <br />TOTAL ESTIMATED CONSTRUCTION COST $413,410.63 <br />CONSTRUCTION SUBTOTAL PART 3: STORM SEWER <br />PART 3: STORM SEWER <br />15% CONTINGENCY <br />TOTAL CONSTRUCTION PART 3: STORM SEWER <br />25% INDIRECT <br />PROJECT TOTAL PART 3: STORM SEWER <br />PART 4: WATERMAIN <br />CONSTRUCTION SUBTOTAL PART 4: WATERMAIN <br />15% CONTINGENCY <br />TOTAL CONSTRUCTION PART 4: WATERMAIN <br />25% INDIRECT <br />PROJECT TOTAL PART 4: WATERMAIN <br />PART 5: SANITARY SEWER <br />CONSTRUCTION SUBTOTAL PART 5: SANITARY SEWER <br />15% CONTINGENCY <br />TOTAL CONSTRUCTION PART 5: SANITARY SEWER <br />25% INDIRECT <br />PROJECT TOTAL PART 5: SANITARY SEWER