Laserfiche WebLink
1-Year TotalDepartment Project # Priority <br />Storm 11 61,741Jackson Street - LC Road - PW42 2 <br />Capital Fund 603 - Storm Water 61,741 <br />Reconstruct Jackson Street from LC Road south to the end <br />345,256Storm Water Total <br />Water <br />Water 03 30,900Large Water Meter Replacement 2 <br />Capital Fund 604 - Water/Sewer 30,900 <br />Replace large water meters in the system (greater than 1") <br />Water 04 50,500Line Repairs 1 <br />Capital Fund 604 - Water/Sewer 50,500 <br />Funds used for water main breaks, valve leaks, hydrant leaks, etc. over the course of the year. <br />Water 05 25,000Paint Hydrants 2 <br />Capital Fund 604 - Water/Sewer 25,000 <br />Paint fire hydrants in a portion of the City. <br />Water 07 8,500Gate Valve Operator 3 <br />Capital Fund 604 - Water/Sewer 8,500 <br />Replace 2014 gate valve operator <br />Water 08 3,000Hydrant Diffusers 3 <br />Capital Fund 604 - Water/Sewer 3,000 <br />Replace two Hydro-Hitch hydrant diffusers <br />Water 09 9,000Water Meter System Gateway 2 <br />Capital Fund 604 - Water/Sewer 9,000 <br />Replace water meter gateway for the meter reading system <br />Water 13 10,000GPS Locating Equipment 1 <br />Capital Fund 604 - Water/Sewer 10,000 <br />Replace 2021 GPS locating equipment <br />Water 25 8,000Paint Booster Station Interior 3 <br />Capital Fund 604 - Water/Sewer 8,000 <br />Paint pumps and other interior features at the booster station. <br />144,900Water Total <br />GRAND TOTAL 5,091,916 <br />Wednesday, October 4, 2023Page 6Produced Using the Plan-It CIP Software