My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
10-25-2023 Council Packet
>
City Council Packets
>
2020-2029
>
2023
>
10-25-2023 Council Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/17/2024 10:42:50 AM
Creation date
1/17/2024 10:28:39 AM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
131
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />Prepared by: Bolton & Menk, Inc. INTRODUCTION <br />Labore Road Corridor Study ǀ 0N1.130034 Page 1 <br />I. INTRODUCTION <br />The City of Little Canada initiated the Labore Road Corridor Study to better understand public <br />perceptions and critical corridor needs along the roadway from Centerville Road to County Road <br />D. This segment of Labore Road is a significant east-west connector roadway that bisects the City <br />and provides access to neighborhoods, businesses, schools, and public amenities like parks and <br />trails. For years, City staff have received complaints from residents that the roadway is unsafe for <br />both motorists, pedestrians, and property owners along the roadway. The primary goals of the <br />corridor study were to: <br />1. determine the corridor deficiencies through both community input and technical <br />review, <br />2. determine which possible improvements were feasible and supported by the <br />community, <br />3. determine the timeframe, cost, and funding options for possible improvements, and <br />4. document the process for use by future decision makers. <br /> <br /> <br />Exhibit 1 – Corridor Study Area
The URL can be used to link to this page
Your browser does not support the video tag.