Laserfiche WebLink
Option 4 Pros and Cons <br />*Visualizations provided are approximate and are intended to help illustrate differences between options <br />Narrow Road + Curb + Multi-Use Trail Cost:$2M - 2.5M <br />Pros: <br />• Extra traffic calming <br />• Minimally intrusive to <br />neighboring properties <br />• One facility for bikes/peds <br />• Reduced road cost <br />Cons: <br />• Boulevard tree removal /replacement (~10) <br />• Must be done with a road project <br />• Storm sewer and curb = cost/liability <br />• No boulevard separation <br />• Power pole relocation (~40) (not city cost)