My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
10-25-2023 Council Packet
>
City Council Packets
>
2020-2029
>
2023
>
10-25-2023 Council Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/17/2024 10:42:50 AM
Creation date
1/17/2024 10:28:39 AM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
131
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Option 4 Pros and Cons <br />*Visualizations provided are approximate and are intended to help illustrate differences between options <br />Narrow Road + Curb + Multi-Use Trail Cost:$2M - 2.5M <br />Pros: <br />• Extra traffic calming <br />• Minimally intrusive to <br />neighboring properties <br />• One facility for bikes/peds <br />• Reduced road cost <br />Cons: <br />• Boulevard tree removal /replacement (~10) <br />• Must be done with a road project <br />• Storm sewer and curb = cost/liability <br />• No boulevard separation <br />• Power pole relocation (~40) (not city cost)
The URL can be used to link to this page
Your browser does not support the video tag.