Laserfiche WebLink
Fund Outlook: <br />As it can be noted in the graph bellow beginning with 2027 the fund is running a large deficit <br />fund balance. The deficit is projected as a result of one proposed large project, the Labore Road <br />trail. If this project is excluded the fund is projected to maintain a positive fund balance for the <br />next ten years with sufficient funding for all of the proposed projects. <br />The trail portion of the Labore Road street project (Centerville to County Road D) was included <br />for completion in 2027 at 2.5 million. This project can potentially be funded with a Metropolitan <br />Council grant or other grant sources If the grants are awarded, it could potentially fund the entire <br />Labore project or only a part. The total project cost is estimated at 5.3 million. Currently the project <br />is scheduled to be completed in three phases: 2027 for 2.5 million, 2031 for $990,000 and 2033 <br />for $1,854,000. Since the grant award is unknown revenues have not been included in the below <br />fund balance projection. If grants are not awarded and the City still desires to move forward with <br />the project, additional revenues (2.5 million) would need to be identified. <br />7