My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
12-20-2023 Council Packet
>
City Council Packets
>
2020-2029
>
2023
>
12-20-2023 Council Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/17/2024 10:42:50 AM
Creation date
1/17/2024 10:41:21 AM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
85
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br /> <br /> STAFF REPORT <br /> <br /> <br /> <br />TO: Mayor Fischer and Members of the City Council <br /> <br />FROM: Bill Dircks, Public Works Director <br /> <br />DATE: December 20, 2023 <br /> <br />RE: City Hall Basement Waterproofing <br /> <br /> <br />ACTION TO BE CONSIDERED: <br />Motion to approve awarding City Hall basement waterproofing work to Albrecht Company for <br />$15,640. <br /> <br />BACKGROUND: <br />Staff has evaluated the two quotes received and had a conversation about the long term needs of <br />City Hall both inside and outside and has reached the following recommendations. <br /> <br />Interior Drain Tile: <br /> <br />Staff recommends moving forward as soon as possible with installing interior drain tile around <br />the entire basement perimeter besides the furnace room. Two quotes were obtained for the work. <br />Innovative Basement Authority is a national company that has a proprietary system that it installs <br />in each of its projects. Albrecht Company installs a similar system and can also perform the <br />work in the winter to have the system ready for spring. In both cases, there will be lots of <br />jackhammering to prepare the trench for the drain tile. Both contractors have indicated that they <br />can perform this loud and messy work outside of normal business hours to make things easier for <br />staff or it may be a combination of off-hours work and a closure of City Hall for a day or two. <br />The quotes for both are below. <br /> <br /> Albrecht Company: $15,640 <br /> Innovative Basement Authority: $29,802 <br /> <br />Albrecht is the clear low quote for the interior portion of work and that is what staff is <br />recommending approval of at the meeting. <br /> <br />Exterior Waterproofing/Landscaping: <br /> <br />Albrecht has recommended additional work around the outside of the building to help protect the <br />building all the way around, including the areas without basement. The brickwork is showing <br />signs of deterioration from water contact. Some drain tile right below the surface around the <br />perimeter of the building coupled with landscaping improvements to help move the water away <br />from the building is the recommendation for the exterior. City Hall needs landscaping work
The URL can be used to link to this page
Your browser does not support the video tag.