Laserfiche WebLink
K:\019789-000\Cad\Plan\3RD ADDITION\019789-000-C-EROS-PLAN-3RD.dwg 1/3/2024 8:00:46 AMCG-08 <br />AS SHOWN SJH / JEB <br />KWHJEB / ATH <br />SCALE: <br />PLAN BY: <br />DESIGN BY: <br />CHECK BY: <br />SHEET <br />WSB PROJECT NO.I HEREBY CERTIFY THAT THIS PLAN, SPECIFICATION,OR REPORT WAS PREPARED BY ME OR UNDER MYDIRECT SUPERVISION AND THAT I AM A DULYLICENSED PROFESSIONAL ENGINEER UNDER THELAWS OF THE STATE OF MINNESOTA.LIC. NO:DATE:REVISIONSNO.DATEDESCRIPTIONPIONEER COMMONS - THIRD ADDITIONLENNAR HOMES - LITTLE CANADA, MINNESOTA019789-000 KYLE W. HOFF01/XX/202459709EROSION <br />CONTROL <br />NOTES <br />EROSION CONTROL NOTES <br />1.A STORMWATER POLLUTION PREVENTION PLAN (SWPPP) IS INCLUDED WITH THIS <br />PROJECT. FAILURE TO IMPLEMENT THE CONTROLS AND PRACTICES OUTLINED <br />WOULD RESULT IN VIOLATION OF THE ENVIRONMENTAL PROTECTION ACT AND CLEAN <br />WATER ACT AND IS GROUNDS FOR PENALTIES. CONTRACTOR IS RESPONSIBLE FOR <br />PAYMENT OF ALL FINES AND PENALTIES ISSUED BY THE CITY AND OTHER GOVERNING <br />AGENCIES FOR INADEQUATE EROSION CONTROL. <br />2.ESTABLISH SEDIMENT CONTROL MEASURES AT THE BEGINNING OF CONSTRUCTION <br />AND MAINTAIN DURING THE ENTIRE LENGTH OF CONSTRUCTION. AREAS WHICH ARE <br />SUBJECT TO SEVERE EROSION AND OFF-SITE AREAS WHICH ARE ESPECIALLY <br />VULNERABLE TO DAMAGE FROM EROSION AND/OR SEDIMENTATION ARE TO BE <br />IDENTIFIED AND RECEIVE ADDITIONAL EROSION AND SEDIMENT CONTROL MEASURES <br />AS DIRECTED BY THE OWNER'S CONSTRUCTION REPRESENTATIVE. EROSION <br />CONTROL DEVICES SHALL BE INSTALLED PROPERLY PRIOR TO ANY LAND DISTURBING <br />ACTIVITIES. <br />3.LOCATIONS OF STABILIZED CONSTRUCTION ENTRANCES INDICATED ON PLANS ARE <br />APPROXIMATE. CONTRACTOR SHALL ADJUST LOCATION AND SIZE OF ENTRANCES TO <br />ACCOMMODATE CONSTRUCTION VEHICLES AND ACTIVITIES. <br />4.CONDUCT ALL LAND DISTURBING ACTIVITIES TO MINIMIZE THE AREA TO BE EXPOSED <br />AT ANY ONE TIME AND MINIMIZE THE TIME OF EXPOSURE. MASS CLEARING AND <br />GRADING OF THE ENTIRE SITE SHOULD BE AVOIDED. COORDINATE ALL LAND <br />DISTURBING ACTIVITIES TO MINIMIZE OFF-SITE SEDIMENTATION DAMAGE. <br />RESTABILIZE DISTURBED AREAS AS SOON AS POSSIBLE AFTER CONSTRUCTION IS <br />COMPLETED IN ACCORDINACE WITH THE NPDES PERMIT. <br />5.PERIODICALLY CLEAN OUT AND DISPOSE OF ALL SEDIMENT ONCE THE STORAGE <br />CAPACITY OF THE DRAINAGE FEATURE OR STRUCTURE RECEIVING THE SEDIMENT IS <br />REDUCED BY ONE-HALF. CLEAN OUT AND DISPOSE OF ALL SEDIMENT AT THE <br />COMPLETION OF THE PROJECT. ALL STREETS IN AND ADJACENT TO THE PROJECT <br />SHALL REMAIN CLEAN AND PASSABLE AT ALL TIMES. ANY SEDIMENT OR DEBRIS <br />SHALL BE REMOVED WITHIN 24 HOURS, OR AS OFTEN AS NEEDED TO ENSURE PUBLIC <br />SAFETY AND TO COMPLY WITH THE NPDES PERMIT. CONTRACTOR IS REQUIRED TO <br />MAINTAIN AND REPLACE ALL EROSION CONTROL DEVICES AS NECESSARY TO COMPLY <br />WITH THE NPDES PERMIT AND CITY REQUIREMENTS AT NO COST TO THE OWNER. <br />6.INLET PROTECTION WILL BE INSTALLED AT ALL CATCH BASINS WITHIN THE PROJECT <br />AREA. THE CONTRACTOR SHALL PROVIDE APPROPRIATE EROSION CONTROL DEVICES <br />FOR STOCKPILE AREAS, INLETS AND DITCHES. DITCHES MUST BE STABILIZED WITHIN <br />200 LINEAL FEET FROM THE PROPERTY EDGE, OR FROM THE POINT OF DISCHARGE TO <br />ANY SURFACE WATER. STABILIZATION MUST BE COMPLETED WITHIN 24 HOURS OF <br />CONNECTING TO SURFACE WATER. <br />7.REMOVE THE TEMPORARY EROSION AND SEDIMENT CONTROL DEVICES AND VERIFY <br />THE CLEANING OUT OF ALL STORM DRAINAGE STRUCTURES, INCLUDING FLUMES, <br />PIPES, AND DITCHES ONCE FINAL STABILIZATION HAS OCCURRED. <br />8.PIPE OUTLETS NEED TEMPORARY OR PERMANENT ENERGY DISSIPATION WITHIN 24 <br />HOURS OF GOING ONLINE. <br />9.WHEN DEWATERING IS REQUIRED, CONTRACTOR MUST SUBMIT A DEWATERING PLAN <br />TO THE ENGINEER FOR APPROVAL AT LEAST 10 DAYS PRIOR TO THE PROPOSED <br />DEWATERING ACTIVITY. THE PLAN MUST INCLUDE A DEWATERING SYSTEM COMPLETE <br />WITH SEDIMENT REMOVAL SYSTEM PRIOR TO DISCHARGE. THE DEWATERING SYSTEM <br />MUST ENSURE THE DISCHARGE IS FREE OF SEDIMENT AND TURBID WATER. <br />10.ADDITIONAL EROSION AND SEDIMENT CONTROLS MAY BE ADDED DURING ANY PHASE <br />OF CONSTRUCTION AS DIRECTED BY THE ENGINEER. <br />11.THE CONTRACTOR SHALL PROVIDE PERIMETER CONTROL DAY - TO - DAY AT <br />DISTURBED, UNSTABILIZED AREAS WHERE EROSION OR SEDIMENTATION COULD BE A <br />PROBLEM. THE ENGINEER SHALL DIRECT THE CONTRACTOR AS TO WHERE <br />PLACEMENT OF PERIMETER CONTROL WILL BE REQUIRED. <br />12.THE CONTRACTOR MUST COMPLY WITH ALL NOISE AND DUST CONTROL ORDINANCES <br />OF THE CITY. <br />13.CONTRACTOR NOT TO DISTURB OR REMOVE EROSION CONTROL DEVICES INSTALLED <br />AS PART OF THE 1ST ADDITION PROJECT WITHOUT WRITTEN APPROVAL OF THE <br />ENGINEER AND THE 1ST ADDITION PROJECT CONTRACTOR. ANY REMOVED DEVICES <br />ARE TO BE RE-INSTALLED AS SOON AS POSSIBLE. <br />PER STANDARD DETAILSINLET PROTECTION <br />TEMPORARY EROSION AND <br />SEDIMENT CONTROL PROVISIONS <br />WEEKLY INSPECTION & AFTER EACH <br />RAIN EVENT-CORRECTIVE WORK AS <br />NECESSARY <br />EROSION & SEDIMENT <br />CONTROL MAINTENANCE <br />ALSO SEE INSPECTION AND MAINTENANCE REQUIREMENTS <br />CONTAINED IN GENERAL PROVISIONS OF SWPPP. <br />(LESS THAN 4:1) - TYPE 1 MULCH, DISC <br />ANCHORED. (GREATER THAN 4:1) - <br />STABALIZED FIBER MATRIX @ 3,000 lbs/ac. IF <br />BLANKET CANNOT BE INSTALLED WITHIN 14 <br />DAYS. <br />SCHEDULE <br />ALSO SEE INSPECTION AND MAINTENANCE REQUIREMENTS CONTAINED IN <br />GENERAL PROVISIONS OF SWPPP. <br />PERMANENT EROSION AND SEDIMENT <br />CONTROL PROVISIONS <br />PERMANENT COVER - ALL <br />OTHER DISTURBED AREAS <br />TYPE 1 STRAW MULCH WITH DISC ANCHOR <br />AND STATE SEED MIX 25-131 (LOW <br />MAINTENANCE TURF GRASS STABILIZATION) <br />@ 220 lbs/ac WITH FERTILIZER TYPE 3 (SLOW <br />RELEASE; 22-5-10) @ 350 lbs/ac. UNLESS <br />BLANKET IS SPECIFIED ON PLANS. <br />OR <br />SOD WITH FERTILIZER TYPE 3 (SLOW <br />RELEASE; 22-5-10) @ 200 lbs/ac <br />STORMWATER POND <br />SLOPE <br />EROSION CONTROL BLANKET <br />CATEGORY 3N/2S (WOOD FIBER) WITH <br />STATE SEED MIX 33-261 @ 35 lbs/ac. <br />WITH TYPE 4 FERTILIZER (NATURAL <br />BASED; 18-1-8) @ 150 lbs/ac. <br />PERMANENT COVER - <br />BLANKETED AREAS <br />EROSION CONTROL BLANKET <br />CATEGORY 3N/2S (WOOD FIBER) WITH <br />STATE SEED MIX 35-241 @ 36.5 lbs/ac <br />WITH TYPE 4 FERTILIZER (NATURAL <br />BASED; 18-1-8) @ 150 lbs/ac. <br />EROSION CONTROL BLANKET CATEGORY <br />3N/2S (WOOD FIBER) <br />EROSION CONTROL <br />BLANKET <br />ITEM <br />PRIOR TO CONSTRUCTION AND <br />IMMEDIATELY AS DICTATED <br />SILT FENCE, PERIMETER <br />CONTROLS <br />MnDOT SEED MIX 21-111 (SPEC 3876) <br />100 lbs/ac. <br />COVER CROPS <br />WEEKLY INSPECTION & AFTER EACH <br />RAIN EVENT-CORRECTIVE WORK AS <br />NECESSARY <br />TEMPORARY SEDIMENT <br />TRAP <br />GRADING NOTES <br />1.GRADING CONTOURS REPRESENT FINISHED GRADE OF FULL DEVELOPMENT. MASS <br />GRADING CONTRACT IN A PREVIOUS PHASE GRADED FULL SITE TO SUBGRADE OF <br />STREETS, PARKING BAYS, BUILDING SLABS AND PONDS. CONTRACTOR TO PAVE 3RD <br />ADDITION STREETS, SIDEWALKS, TRAILS AND PARKING BAYS TO FINISHED GRADE AS <br />SHOWN. <br />BP PIPELINE CONSTRUCTION AND EXCAVATION NOTES <br />1.CONTRACTOR SHALL COORDINATE WITH BP PIPELINE ENGINEERING AND RIGHT-OF-WAY STAFF FOR ALL CONSTRUCTION ACTIVITIES OVER AND NEAR PIPELINE. NO <br />EXCAVATION OR CONSTRUCTION ACTIVITY WILL BE PERMITTED IN THE VICINITY OF THE PIPELINE UNTIL ALL APPROPRIATE COMMUNICATIONS HAVE BEEN MADE WITH BP'S <br />FIELD OPERATIONS AND THE RIGHT-OF-WAY DEPARTMENT. <br />2.CONTRACTOR SHALL PROVIDE A PLAN FOR WHERE CONSTRUCTION EQUIPMENT WILL CROSS THE PIPELINE TO BP ENGINEERING STAFF WHICH WILL INCLUDE THE <br />FOLLOWING: <br />2.1.WHERE EQUIPMENT WILL CROSS THE PIPELINE; <br />2.2.THE DEPTH OF THE PIPE AT THE CROSSINGS; <br />2.3.ANY PROPOSED RAMPING OVER THE PIPELINE; <br />2.4.TYPE AND FULLY LOADED WEIGHT FOR THE EQUIPMENT. FOR TRACKED EQUIPMENT, THE TRACK SHOE WIDTH AND LENGTH OF TRACK ON GROUND SHALL BE <br />PROVIDED. FOR WHEELED EQUIPMENT, THE NUMBER OF AXLES (SINGLE OR TANDEM) SHALL BE PROVIDED. <br />3.CONTRACTOR MAY NOT TRANSPORT CONSTRUCTION MATERIALS OR EQUIPMENT LONGITUDINALLY OVER THE PIPELINE. WHERE IT IS NECESSARY FOR CONSTRUCTION <br />EQUIPMENT, OR EQUIPMENT TRANSPORTING CONSTRUCTION MATERIALS, TO CROSS THE PIPELINE, THE CROSSING OF THE PIPELINE RIGHT-OF-WAY SHALL BE AT, OR AS <br />NEAR TO, A 90° ANGLE AS IS FEASIBLE. <br />4.NO TRACK TYPE CONSTRUCTION EQUIPMENT SHALL BE PERMITTED TO PIVOT OR TURN DIRECTLY OVER THE TOP OF THE PIPELINE. <br />5.A SCRAPER OR PAN TYPE TRACTOR SHALL NOT BE USED FOR REMOVAL OF SOIL WITHIN TEN FEET (10') OF THE CENTERLINE OF THE PIPELINE. RUBBER TIRE OR SMALL <br />TRACK TYPE EQUIPMENT IS AN ACCEPTABLE ALTERNATIVE. <br />6.A SHEEPSFOOT ROLLER SHALL NOT BE USED FOR COMPACTION PURPOSES WITHIN THE BP/CHICAP/OLYMPIC RIGHT-OF-WAY. <br />7.NO VIBRATORY ROLLERS SHALL BE USED WITHIN THE BP/CHICAP/OLYMPIC RIGHT-OF-WAY. <br />8.NO EXCAVATION OR BACKFILLING SHOULD OCCUR WITHIN THE PIPELINE RIGHT-OF-WAY FOR ANY REASON UNLESS PRIOR PERMISSION IS OBTAINED FROM BP PERSONNEL <br />WHO ARE ON-SITE AND CAN REVIEW THE WORK. <br />9.ANY EXCAVATION WITHIN TWO FEET (2') OF THE PIPELINE SHALL BE DONE BY HAND, OR BY OTHER NON-MECHANICAL MEANS AS APPROVED BY BP PERSONNEL WHO ARE <br />ON-SITE AND CAN REVIEW THE WORK. <br />10.NO EXCAVATION OR BACKFILLING SHOULD OCCUR WITHIN THE PIPELINE RIGHT-OF-WAY FOR ANY REASON UNLESS PRIOR PERMISSION IS OBTAINED FROM BP PERSONNEL <br />WHO ARE ON-SITE AND CAN REVIEW THE WORK.