My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
07-10-2024 Council Packet
>
City Council Packets
>
2020-2029
>
2024
>
07-10-2024 Council Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/28/2024 9:08:17 PM
Creation date
7/28/2024 9:05:51 PM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
32
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
CITY OF LITTLE CANADA <br />COUNTRY DRIVE - QUANTITY TRACKING BY AREA <br />SAP 200-101-012 <br />CITY PROJECT NO. PW42 <br />BMI PROJECT NO. 0N1.125375 <br />DATE: <br />QUANTITY COST QUANTITY COST QUNATITY COST QUANTITY COST QUANTITY COST QUANTITY COST QUANTITY COST <br />PROJECT TOTAL TOTAL COST <br />COUNTRY DRIVE <br />SAP 200-101-012 NON-PARTICIPATING LOCAL IMPROVEMENTS <br />PARTICIPATING NON-PARTICIPATING <br />AS BID UNIT PRICE <br />STREET <br />PW 42 / FUND 450 <br />THUNDER BAY TRAIL <br />PARKS 29 / FUND 456 <br />PIONEER PARK TRAIL <br />PARKS 37 / FUND 400 <br />JACKSON STREET <br />PW 42 / FUND 450 <br />STORM 11 / FUND 603 <br />MNNR RR DITCH CLEANING <br />STORM 01 / FUND 603WATER/SEWER <br />PW 42 / FUND 450 <br />STORM <br />STORM 10 / FUND 603 <br />ITEM NO.DESCRIPTION UNIT <br />85 BLANKET CATEGORY 20, SEED MIX 25-131, AND FERTILIZER SY $3.79 40 $151.60 $0.00 $0.00 40 $151.60 $0.00 $0.00 $0.00 $0.00 <br />86 ROLLED EROSION PREVENTION CATEGORY 50 SY $2.55 0 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 <br />$76,129.88 $0.00 $0.00 $76,129.88 $0.00 $0.00 $0.00 $0.00 <br />87 REMOVE AND REPLACE GATE VALVE TOP EA $1,122.17 0 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 <br />88 BOLT REPLACEMENT - HYDRANT EA $2,558.77 0 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 <br />89 BOLT AND VALVE BOX REPLACEMENT - VALVE EA $2,736.81 0 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 <br />$0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 <br />90 REMOVE CASTING (SANITARY)EA $163.27 0 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 <br />91 CASTING ASSEMBLY (SANITARY)EA $719.56 0 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 <br />92 ADJUST FRAME & RING CASTING W/ INFI SHIELD (SANITARY) EA $540.62 0 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 <br />$0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 <br />93 MOBILIZATION LS $2,883.75 0 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 <br />94 CLEARING AND GRUBBING LS $4,400.32 0 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 <br />95 COMMON EXCAVATION (EXCESS DITCH MATERIAL)CY $36.89 0 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 <br />96 CLEAN (JET/VAC) CULVERT LINE LF $56.26 0 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 <br />97 TRAFFIC CONTROL LS $439.24 0 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 <br />98 CULVERT END PROTECTION EA $154.59 0 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 <br />99 DITCH GRADING LF $10.86 0 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 <br />100 BLANKET CATEGORY 20, SEED MIX 34-181, AND FERTILIZER SY $6.89 0 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 <br />101 COMMON TOPSOIL BORROW CY $47.15 0 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 <br />102 WATER (TURF ESTABLISHMENT)MGAL $140.89 0 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 <br />$0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 <br />103 MOBILIZATION LS $9,967.00 0.70 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 0.70 $6,976.90 $0.00 <br />104 SAWCUT BITUMINOUS PAVEMENT LF $1.76 0 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 <br />105 REMOVE BITUMINOUS PAVEMENT - TRAIL SY $6.38 2620 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 2620 $16,715.60 $0.00 <br />106 FINISH GRADING - TRAIL SY $3.75 2620 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 2620 $9,825.00 $0.00 <br />107 AGGREGATE BASE CLASS 5 CY $38.74 67 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 66.64 $2,581.49 $0.00 <br />108 TYPE SP 9.5 WEARING COURSE MIX (2,C) - TRAIL TON $114.00 363 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 362.52 $41,327.28 $0.00 <br />109 TRAFFIC CONTROL LS $2,748.00 0.70 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 0.70 $1,923.60 $0.00 <br />110 EROSION CONTROL SUPERVISOR LS $1,000.00 0.70 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 0.70 $700.00 $0.00 <br />111 SILT FENCE TYPE MS LF $5.68 1600 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 1600 $9,088.00 $0.00 <br />112 STORM DRAIN INLET PROTECTION EA $154.63 3 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 3 $463.89 $0.00 <br />113 CULVERT END PROTECTION EA $154.63 0 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 <br />114 HYDROMULCH, SEED MIX 25-131 AND FERTILIZER SY $2.99 0 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 <br />115 COMMON TOPSOIL BORROW CY $47.16 0 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 <br />$89,601.76 $0.00 $0.00 $0.00 $0.00 $0.00 $89,601.76 $0.00 <br />116 6" CONCRETE WALK - PEDESTRIAN RAMP SF $16.00 0 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 <br />117 TRUNCATED DOMES SF $75.00 0 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 <br />$0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 <br />118 6' DIA MANHOLE WITH TOPSLAB EA $12,200.00 0 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 <br />119 18" RC PIPE LF $150.00 0 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 <br />$0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 <br />CONSTRUCTION SUBTOTAL (5% RETAINAGE HELD):$414,858.79 PW42:$233,798.84 PW42:$0.00 STORM 10:$83,870.20 COMBINED:$0.00 PARKS 37:$3,608.38 PARKS 29:$93,581.36 STORM 01:$0.00 <br />PW 42:$0.00 <br />STORM 11:$0.00 <br />CHANGE ORDER NO. 1 <br />(P) - PLAN QUANTITY <br />CONSTRUCTION SUBTOTAL CHANGE ORDER NO. 3 <br />CHANGE ORDERS <br />CONSTRUCTION SUBTOTAL CHANGE ORDER NO. 1 <br />CHANGE ORDER NO. 2 <br />CONSTRUCTION SUBTOTAL CHANGE ORDER NO. 2 <br />CHANGE ORDER NO. 3 <br />PART 4 - SANITARY SEWER <br />CONSTRUCTION SUBTOTAL PART 4 - SANITARY SEWER <br />BID ALTERNATE <br />PART 5 - MNNR DITCH GRADING <br />CONSTRUCTION SUBTOTAL PART 5 - MNNR DITCH GRADING <br />CONSTRUCTION SUBTOTAL PART 2 - STORM SEWER <br />PART 3 - WATERMAIN <br />CONSTRUCTION SUBTOTAL PART 3 - WATERMAIN <br />City of Little Canada, MN 3 of 4 Preliminary Engineer's Estimate
The URL can be used to link to this page
Your browser does not support the video tag.