My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
08-14-2024 Council Packet
>
City Council Packets
>
2020-2029
>
2024
>
08-14-2024 Council Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/13/2024 12:04:20 PM
Creation date
9/13/2024 11:57:47 AM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
59
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
CITY OF LITTLE CANADA <br />COUNTRY DRIVE - QUANTITY TRACKING BY AREA <br />SAP 200-101-012 <br />CITY PROJECT NO. PW42 <br />BMI PROJECT NO. 0N1.125375 <br />DATE: <br />QUANTITY COST QUANTITY COST QUNATITY COST QUANTITY COST QUANTITY COST QUANTITY COST QUANTITY COST <br />PROJECT TOTAL TOTAL COST <br />COUNTRY DRIVE <br />SAP 200-101-012 NON-PARTICIPATING LOCAL IMPROVEMENTS <br />PARTICIPATING NON-PARTICIPATING <br />AS BID UNIT PRICE <br />STREET <br />PW 42 / FUND 450 <br />THUNDER BAY TRAIL <br />PARKS 29 / FUND 456 <br />PIONEER PARK TRAIL <br />PARKS 37 / FUND 400 <br />JACKSON STREET <br />PW 42 / FUND 450 <br />STORM 11 / FUND 603 <br />MNNR RR DITCH CLEANING <br />STORM 01 / FUND 603WATER/SEWER <br />PW 42 / FUND 450 <br />STORM <br />STORM 10 / FUND 603 <br />ITEM NO.DESCRIPTION UNIT <br />113 CULVERT END PROTECTION EA $154.63 0 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 <br />114 HYDROMULCH, SEED MIX 25-131 AND FERTILIZER SY $2.99 1910 $5,710.90 $0.00 $0.00 $0.00 $0.00 $0.00 1910 $5,710.90 $0.00 <br />115 COMMON TOPSOIL BORROW CY $47.16 20 $943.20 $0.00 $0.00 $0.00 $0.00 $0.00 20 $943.20 $0.00 <br />$128,909.58 $0.00 $0.00 $0.00 $0.00 $0.00 $128,909.58 $0.00 <br />116 6" CONCRETE WALK - PEDESTRIAN RAMP SF $16.00 0 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 <br />117 TRUNCATED DOMES SF $75.00 0 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 <br />$0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 <br />118 6' DIA MANHOLE WITH TOPSLAB EA $12,200.00 1 $12,200.00 $0.00 $0.00 $0.00 $0.00 $0.00 1 $12,200.00 $0.00 <br />119 18" RC PIPE LF $150.00 12 $1,800.00 $0.00 $0.00 $0.00 $0.00 $0.00 12 $1,800.00 $0.00 <br />$14,000.00 $0.00 $0.00 $0.00 $0.00 $0.00 $14,000.00 $0.00 <br />CONSTRUCTION SUBTOTAL (5% RETAINAGE HELD):$901,907.92 PW42:$343,259.76 PW42:$0.00 STORM 10:$139,210.29 COMBINED:$148,251.22 PARKS 37:$99,998.06 PARKS 29:$171,188.58 STORM 01:$0.00 <br />PW 42:$121,046.97 <br />STORM 11:$27,204.26 <br />(P) - PLAN QUANTITY <br />(EV) - EXCAVATED VOLUME <br />(CV) - COMPACTED VOLUME <br />(LV) - LOOSE VOLUME <br />(T) - TOKEN QUANTITY <br />CONSTRUCTION SUBTOTAL CHANGE ORDER NO. 3 <br />CONSTRUCTION SUBTOTAL CHANGE ORDER NO. 1 <br />CHANGE ORDER NO. 2 <br />CONSTRUCTION SUBTOTAL CHANGE ORDER NO. 2 <br />CHANGE ORDER NO. 3 <br />City of Little Canada, MN 4 of 4 Preliminary Engineer's Estimate
The URL can be used to link to this page
Your browser does not support the video tag.