My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
09-11-2024 Council Packet
>
City Council Packets
>
2020-2029
>
2024
>
09-11-2024 Council Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/13/2024 12:04:20 PM
Creation date
9/13/2024 12:00:54 PM
Metadata
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
246
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />Apadana and three other vendors also offered a larger project that would include the southeast <br />portion of the roof. This would result in more energy savings over time but would be more <br />expensive up front and would have more maintenance and equipment involved. There are also a <br />number of trees on the east/southeast side of the property that would inhibit the sun from getting <br />to the panels. Staff does not think it would be a good idea at this time to pursue a larger project. <br />There is information on the optional larger project in the Apadana proposal included in the <br />packet. <br /> <br />The total cost for the south portion of the roof project is $54,390. Assuming the city receives <br />grant funding and federal tax credit payment the actual cost to the city will be $5,439. <br />Additional costs may be incurred if the electrical service or any electrical panels at City Hall <br />need to be upgraded. Funds are available, and these costs can be programmed into the Capital <br />Infrastructure Plan for 2025. <br /> <br />As a reminder, if awarded the grant, staff would coordinate the installation of the solar <br />panels with the planned 2025 Capital Improvement Plan project to re-shingling the City <br />Hall roof. <br /> <br />BUDGET: <br />At this time, there is no budgetary impact; however, the anticipated city match for a solar <br />installation will be budgeted within the 2025 Capital Improvement Plan budget for consideration. <br />Based on the proposal and 60% award of project costs, staff has determined the budgetary impact <br />to the 2025 Capital Improvement Plan would be $5,439 with additional costs possible if <br />upgrades to the Xcel service or electrical panels need to be made. <br /> <br />RECOMMENDATION: <br />Staff recommends the City Council direct staff to authorize acceptance of the proposal for solar <br />on City Hall from Apadana Energy (See full RFP response Attachment A). <br /> <br />ATTACHMENTS: <br />• Attachment A: Request for Proposal Response from Apadana Energy <br /> <br /> <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.