My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
09-11-2024 Council Packet
>
City Council Packets
>
2020-2029
>
2024
>
09-11-2024 Council Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/13/2024 12:04:20 PM
Creation date
9/13/2024 12:00:54 PM
Metadata
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
246
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />11 <br /> <br /> <br />Figure 5: Proposed location of new electrical equipment on building exterior <br />From the disconnect, the wiring in conduit will penetrate through the wall and into the IT room. From the IT <br />room, the conduit will be drilled through the floor and into the electrical area of the basement. Once at the <br />basement, a 100A fused disconnect will be mounted within 25’ of the CT cabinet, possibly next to the existfng <br />transfer switch or perhaps on the opposite wall from the cabinet depending on exact space available. Finally, <br />the point of interconnectfon will be made at the CT cabinet. <br />It’s possible reaching the basement will be difficult. If for some reason the route through the IT room is not <br />possible, then a hole could be dug below grade and the conduit penetrated through the wall and into the <br />basement. This is not preferable, and Apadana will work with the city to find other possible routes to the <br />basement through the inside of the building. <br />
The URL can be used to link to this page
Your browser does not support the video tag.