My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
11-10-76 Meeting Attachment
>
City Council Packets
>
1975-1979
>
1976
>
1976 Meeting Attachments
>
11-10-76 Meeting Attachment
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/24/2024 4:14:10 PM
Creation date
9/24/2024 2:18:06 PM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
26
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
CHANGE OR WORK ORDER NO. 1 <br />14s� PROJECT RM Imp r . 74-6 , 7 & 8 <br />PROJECT NO. 76-8 <br />CONTRACTOR: Hennen Const. Co. <br />DATE November 15, 1976 <br />LOCATION Little Canada <br />OWNER City of Little Canada <br />NATURE OF CHANGE OR ADDITION <br />Description and Cost: Construct 8" WM on Jackson St. from Little Canada Rd. to <br />Bryan, 6" RM on Bryan St. from Jackson St. 440 feet crest. <br />8" <br />DIP WM <br />420 <br />Lin. Ft. <br />@ 11.00 <br />= 4,620.00 <br />6" <br />DIP AIM <br />440 <br />Lin. F t . <br />@ 9.50 <br />= 4,180.00 <br />8" <br />GV & Box <br />1 <br />Each <br />@300.00 <br />= 300.00 <br />6" <br />GV & Box <br />1 <br />Each <br />@225.00 <br />= 225.00 <br />8 <br />x 6 Tee <br />2 <br />Each <br />@150.00 <br />= 300.00 <br />6 <br />x 6 Tee <br />1 <br />Each_ <br />@120.00 <br />= 120.00 <br />8" <br />P1 ug <br />1 <br />Each <br />@ 40.00 <br />40.00 <br />6" <br />Plug <br />I <br />Each <br />@ 30.00 <br />= 30.00 <br />i" <br />Corp. Cocks <br />12 <br />Each <br />@ 12.00 <br />= 144.00 <br />1" <br />Curb, B.ox & Stops <br />12 <br />Each <br />@ 35.00 <br />= 420.00 <br />1" <br />Copper Dater Pipe Service <br />410 <br />Lin. Ft. <br />@ 6.00 <br />= 2,460.00 <br />Hydrants <br />2 <br />Each <br />@600.00 <br />= 1,200.00 <br />- <br />14,039.00 <br />Is Cost Actual <br />or Estimated? <br />The Above <br />prices <br />are based on actual bid <br />prices. Me <br />quantities <br />are <br />estimated. <br />This authorizes <br />the Contractor to <br />perform this work as <br />part of the Base Contract <br />when signed by <br />all parties. <br />Agreed <br />to by Contractor <br />By <br />Superintendent of Foreman <br />Approved by Engineer: <br />MI LNER W. CARLEY & ASSOCIATES <br />M <br />Approve by Owner,:,.,, <br />By <br />By <br />-� <br />Clerk's exhibit_ no. S Z4 <br />meeting 11-10-76 <br />
The URL can be used to link to this page
Your browser does not support the video tag.