Laserfiche WebLink
1976 19 <br />CONSULTING ENGINEER <br />PROFESSIONAL SERVICES <br />AGREEMENT <br />BETWEEN <br />ENGINEERS OWNER <br />MILNER W. CARLEY <br />-- 't <br />& ASSOCIATES AND <br />ti. 5 <br />,2 <br />:mot <br />CONSULTING ENGINEERS <br />FOR <br />The*ENGINEERS shall furnish all materials and supplies and p2rsornel to <br />render the servi..ces as set forth .,,i n tKi s agreement. Payments shall be <br />made by the OWNER to the ENGINEERS in accordance with the fee schedules <br />as stipulated h.e.rei n.. <br />�EtT10N i <br />PROJECTS UNDER.CONTRACT - BASIC'FEE ITEMS <br />1. Feasibility Report <br />2. Plan Survey <br />3. Prepare Complete Plans t .. <br />4. Prepare. Complete -Spec i fi cations ;. t <br />1 . FEAS I BI L IT,Y .R.F. PORT - <br />A feasibility report may include some or all of the following: <br />Preliminary studies , estimates of costs, reports, site <br />inspections preliminary sketches and conferences with OWNER. <br />T h i s i t e m shall comprise twenty per cent C20%) of the basic ' <br />�y fee <br />2. PLAN SURVEY <br />The plan survey shall includ-e all of the survey work performed <br />in the field to provide complete.and accurate information <br />pertaining. to existing conditions. This survey is essenti a . <br />for the use of the DESIGN ENGINEER i.n preparation of the p.1 an;�'' ;a <br />The p.lan survey shall comprise ten per cent C10%) of the b.as <br />f e e . <t <br />3. PREPARATION' OE PLANS. y <br />Comp.lete'plans shall include detailed working drawings with ' <br />Sufficient. sections., elevations, structural details and <br />schedules to enable a contractor'to quote a firm price on <br />i the work wi thout' additional engineering. to <br />- ya i4c 1. <br />clerk's exhibitf <br />1 L#"Lr• <br />meeting Feb 11-1976 <br />x. <br />