Laserfiche WebLink
Sec se-pf steep existing slopes and the +freeway right-of-way <br />fen ei, t appears that we shoul d stick to the existing 361 width. <br />4j. <br />We estimate the cost of a complete State Aid street between Spruce <br />Street and the railroad tracks to be as follows: <br />44 foot street width. . . . . . .$1039000.00 <br />36 fbot street width. . . . . . . .$ 811,000.00 <br />The ab.©ve costs include grade correction, existing bituminous. base <br />correction, concrete curb & gutter, a minimum of 3" of bituminous <br />surface and turf established. Also miscellaneous overhead costs <br />such as Engineering, legal, fiscal and administration. <br />We have also estimated the cost of improving that section south <br />from the railroad tracks to South Owasso Boulevard. <br />-1- <br />Original letter on file under ' <br />� Clerk's exhibit no. 4 <br />Municipal State Aids report <br />(clerk's Office) meeting 7-14-76 <br />( Country Dr Imp.) <br />