My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
10-12-77 Meeting Attachment
>
City Council Packets
>
1975-1979
>
1977
>
1977 Meeting Attachments
>
10-12-77 Meeting Attachment
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/24/2024 4:31:11 PM
Creation date
9/24/2024 2:42:53 PM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
27
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
,� West Highway 95 <br />Paul, Minnesota 55112 <br />434-3301 <br />IMPROVEMENT <br />15 Fourth Avenue S.E. <br />St. Cloud, Minnesota SMI <br />251-7751 <br />514 Oak St. <br />Sauk Centre. Minnesota 55575 <br />552.3M4 <br />Sept. 21, 1977 <br />FEASIBILITY REPORT - Improvement -77 9 <br />Watermains on Spruce Street extended from Burlington Northern <br />Railroad Tracks to a point approximately 500 feet southerly <br />INITIATION: Petition <br />ATUS OF PLANS: None <br />FEASIBILITY: This project is feasible and will result in benefits to <br />the property it serves. <br />COMPLETION: This project should be included in the large water project <br />planned for Little Canada in 1978. The main should be <br />extended southerly to connect with the existing 12" main <br />on South Owasso Blvd. <br />EASEMENTS: Permanent easements and construction easements will be <br />required. <br />:STIMATED COSTS: Part A - RR Tracks to a point 500 feet southerl <br />Construction <br />Contingencies (10%) <br />Legal (2%) <br />Fiscal (2%) <br />Administration (1%) <br />Engineering, Staking & <br />Capital Interest (8%) <br />Inspection (15%) <br />Total Estimated Cost of Project (Part A) <br />Part B - RR Tracks to South Owasso Blvd. <br />Construction <br />Contingencies (10%) <br />Legal (2%) <br />Fiscal (2%) <br />Administration 0 %) <br />Engineering, Staking & Inspection (15%) <br />���� n� � Capital Interest (8%) <br />v <br />Total Estimated Cost of Project (Part B) <br />CLERK'S EXHIBIT NO. <br />Meeting-10-12-77 <br />e <br />James . Kleinschmidt P.E. <br />Registration No. 5122 <br />$15,750.00 <br />1,575.00 <br />315.00 <br />315.00 <br />157.50 <br />2,362.50 <br />1,260.00 <br />$21,735.00 <br />5Ep 23 1977 <br />CITY U, <br />LITTLE CANADAr <br />$62,350.00 <br />6,235.00 <br />1,247.00 <br />1,247.00 <br />623.50 <br />9,352.50 <br />4,988.00 <br />$86,043.00 <br />
The URL can be used to link to this page
Your browser does not support the video tag.