Laserfiche WebLink
r <br />V . SEWAGE TREATMENT PLANT <br />Name of PI -ant: Pigs E e Plant -Type of Plant <br />Receiving Water(s): <br />Plant Design Data: <br />t <br />Design Hydraulic capacity (mgd): <br />Design BOD5 capacity (lbs/day): <br />• Present Operating Data:, <br />Monthly Average of Daily Flow (mgd): <br />Monthly Average Influent BOD5 Concentration (mg/1): <br />Monthly Average Effluent BOD 5-.Concentration (mg/1): <br />Are there any seasonal sources of wastes discharging to the <br />treatment plant which would change any of the above? <br />VI. GENERAL: <br />1. Are monthly operation reports submitted to the Agency? <br />( i f applicable) G J Yes [ ] No <br />2. Stipulation status (if applicable)? <br />3. Does the proposed sanitary sewer extension comply with <br />-the comprehensive sewer plan or other plans? ( if <br />applicable, please list appropriate plan(s): <br />4. Remarks: <br />Signed d�• <br />Engineer <br />1123 <br />Reg. No. <br />Signed <br />uthor zed City Representative <br />( tto ney, Mayor, Clerk,etc.Pl::ase spec.) <br />'% I \%Wd <br />