My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
9-14-77 Meeting Attachment
>
City Council Packets
>
1975-1979
>
1977
>
1977 Meeting Attachments
>
9-14-77 Meeting Attachment
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/24/2024 4:31:11 PM
Creation date
9/24/2024 2:54:14 PM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
31
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
500 West Highway 95 <br />St. Paul, Minnesota 55112 <br />484-3301 <br />City Council <br />City of Little Canada <br />515 Little Canada Road <br />Little Canada, MN 55117 <br />Gentlemen: <br />18 Fourth Avenue S.E. <br />St. Cloud, Minnesota 5001 <br />251.7751 <br />314 Oak St. <br />Sauk Centre, Minnesota 5078 <br />352a584 <br />Sept. 9, 1977 <br />Re: Drainage on Old County Road C from Jackson <br />Street to Lakeshore Avenue <br />The Ramsey County Highway Department has a plan for <br />improving Old County Road C from Jackson Street to a point <br />360 feet easterly, A drainage problem exi-sts at the easterly <br />�..i end of this project. I recommend tKat this drainage problem <br />be corrected as follows: <br />1, Plug the culvert that crosses County Road C <br />in the middle of the Mock (Estimated Cost $10.0) <br />2. Furnish and install 3 - 15" CMP culverts on the <br />south side of County Road C. Each culvert <br />to be 30 feet long (Estimated Cost $1400) <br />3, Deepen ditch an average of 3 feet on south- side' <br />for 500 feet (Estimated Cost $15001 <br />Sod ditch (Estimated Cost $500) <br />Therefore, the total estimated cost of this construction <br />work is $350.0. The net effect of this project will be to keep <br />the water [that falls on the north side of the road) on the <br />north side of the road. Also, the -water from the south side of the <br />road would 6e confined .to the new ditch constructed along the <br />south side of the road. The ditch would tie deep enough to drain <br />most of the water that collects in the back yard of the house on <br />the south side of the street in the middle of the block. However, <br />some filling would be necessary in the back -yard and also some <br />ditching will be necessary to convey the water to the highway ditch. <br />This work would be done by the property owner. <br />CLERK'S EXHIBIT Id0 ice_ <br />oMEETING-9-14-ii77 <br />F1 s�1�api�alfZmp.u=d�o. Rd. "C" <br />
The URL can be used to link to this page
Your browser does not support the video tag.