Laserfiche WebLink
5. Agency. "Agency" means a local until of government as <br />• L <br />defined in Laws of 1977, Ch. 421, Sec. 2, Subd. 1. <br />6. Construction. The physical development of a facility <br />suitable for use as a bilcevlay. . <br />7. Reconstruction. The physical redevelopment of an existing <br />facility so as to make it suitable for use as a bikeway. <br />8. matching Funds. Those funds required by law to be supplied <br />by the grant requesting agency. <br />D. Grant Project Eligibility. <br />�.. The grant project requests shall be consistent with <br />the informational requirements of the department. <br />2. No project, the construction of which has already <br />commenced or for which a construction contract has <br />already been let, shall be -eligible for a grant under <br />this program. <br />3. There.. shall be an agreement by the agency to accept <br />the n1 .�itenance and operational coats of the bikeway. <br />4, No grant project:, located on t.rur_1•, h ghzr:ay _ rights -- <br />of -way will be eligible. <br />5. In addition to bikeway struc ,ure construction and/or <br />reconstruction, bicycle safety improvement work, shelters, <br />storage facilities and signs racy be eligible for grant <br />funding. <br />6, Project work may be carried out by award of a contract <br />in accord with all @ plicab].e lass 'to the 1 ot•:est <br />• responsible bidder (contract ��;o��k) or by the applying <br />n <br />T U", Ire F j P L <br />LY <br />