Laserfiche WebLink
B. <br />U <br />3. Construction Plans: Construction lens <br />P shall include detailed <br />working drawings with sufficient sections elevations evations and <br />structural details to enable a prospective <br />Contractor to quote <br />or bid a firm price on the work without additional engineering. <br />4. Construction Specifications: Specifics <br />��- bons shall be of sufficient <br />scope to enable a prospective Contractor to quote o q r bid a firm <br />price based on a set standard of quality,e performance and procedure. <br />BASIC FEE SCHEDULE <br />The percentage rates shown below shall be consi <br />dered full compensation <br />for the Basic Services outlined above, for assisting in the taking <br />and tabulating of bids and for reviewing the bids and submitting a <br />recommendation regarding award (See Section II Paragraph H on Rebidding): <br />a. Less than $20,000.00 <br />per diem rates <br />b. 20,000.00 to 50,000.00 <br />g.5% <br />c. 50,000.00 to 100,000.00 <br />8.0% <br />d. 100,000.00 to 200,000.00 <br />e. 200,000.00 to 500,000.00 <br />7.0% <br />f. 500,000.00 to 11000,000.00 <br />6.0% <br />g. 1,000,000.00 and over <br />5.5% <br />The percentage rates apply to the lowest responsible <br />bid unless a <br />Portion of the work on which Engineering Services were <br />performed is <br />deleted by the Oviner prior to the taking of bids. If the latter <br />occurs, the percentage rates -shall apply to the low bid and the <br />Engineers shall receive additional compensation for services <br />performed on the delted portion of the work based on the Per Diem <br />-2- <br />