Laserfiche WebLink
SPECIAL <br />CONDITIONS: <br />con't <br />RIGHT OF WAY: <br />EASEMENTS: <br />FEASIBILITY: <br />COMPLETION: <br />Page 2. <br />Secondly, a watermain loop between Rice St, and Country Dr. <br />could then be completed. <br />Right of Way would have to be acquired. <br />No easements are required. <br />This improvement is feasible. <br />1978 <br />FINANCING: Estimated Cost: <br />i <br />Section I - Country Drive - So. Owasso Blvd. to RR <br />36 Ft. Wide 2275 Ft. Long <br />Construction Cost . . . . . . . . . . $ 67.9143.00 <br />Contingency & Overhead 18,800.00 - <br />$104,743.00 <br />Section II - Country Drive from Little Canada Road t ! o So. Owasso <br />Length = 3050 f t. Existing Width = 241 New Width=36' <br />Construction Cost . . . . . . . . . . $ll5,900.00 ,. <br />Contingency & Overhead . . . . . . . 32,452.00 <br />$148052.00 <br />Section IIIA - So. Owasso Blvd. from St. Paul Waterwarks <br />East to Ditch 16 - 500' <br />Construction Cost . . . . . . . . . . $ 15,150.00 <br />Contingency & Overhead 4,242.00 <br />- $ 19092.00 <br />Section IIIB - So. Owasso Branch Ditch 16 to Condit St. <br />Length = 1300 ft. <br />Construction Cost . . . . . . . . . . $133,150.00 <br />Contingency & Overhead . . . . . . . . 37,280.00 <br />$1702430.00 <br />84 <br />CLERK'S EXHIBIT NO. ' <br />Meeting-4-12-78 <br />