Laserfiche WebLink
Contract Tvo. 78-1 <br />T5/6 <br />2.0E Electrical: <br />The Contractor shall furnish the two rear steel posts with \WWI <br />openings for a standard four outlet recetitacle. The Contractor <br />shall also provide conduit from the posts to the rear of the <br />amphitheater suitable to accommodate the electrical work. All <br />electrical work will be by others. <br />2.07 Sodding: <br />The Contractor will be responsible for providing and installing <br />topsoil and sod to repair all areas disturbed by construction. <br />