My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
01-11-2024 Planning Commission Packet
>
Agenda Packets
>
2020-2029
>
2024
>
01-11-2024 Planning Commission Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/27/2024 10:56:19 AM
Creation date
9/27/2024 10:35:26 AM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
139
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
K:\019789-000\Cad\Plan\3RD ADDITION\019789-000-C-LNSCP-PLAN-3RD.dwg 1/3/2024 8:11:07 AM <br />LS-37AS SHOWNAMAMKTSCALE:PLAN BY:DESIGN BY:CHECK BY:SHEETWSB PROJECT NO.I HEREBY CERTIFY THAT THIS PLAN, SPECIFICATION, <br />OR REPORT WAS PREPARED BY ME OR UNDER MY <br />DIRECT SUPERVISION AND THAT I AM A DULY <br />LICENSED LANDSCAPE ARCHITECT UNDER THE <br />LAWS OF THE STATE OF MINNESOTA. <br />LIC. NO:DATE: <br />REVISIONS <br />NO.DATE DESCRIPTION <br />PIONEER COMMONS - THIRD ADDITION <br />LENNAR HOMES - LITTLE CANADA, MINNESOTA019789-000ANDY MASTERPOLE <br />01/XX/2024 22226LANDSCAPEDETAILS1/2"NOTES:1.ROOTS OF ALL BALLED AND BURLAPPED STOCK SHALL FILL THE SOIL BALL, BE FREE OF KINKS, CIRCLING AND GIRDLING, AND THEUPPERMOST ROOTS SHALL NOT BE MORE THAN FOUR INCHES BELOW THE TOP OF THE SOIL BALL. TRANSPORT ROOTS SHALL BESYMMETRICAL AROUND THE TRUNK / STEM OF THE PLANTS. SOIL BALLS MUST BE CENTERED OR NO MORE THAN 10% OFF CENTER.2.WHEN MOVING PLANTS, LIFT FROM BENEATH THE ROOT BALL, DO NOT LIFT BY THE TRUNK AND DO NOT BREAK OR LOOSEN THEROOTBALL.3.BACKFILL PLANTING PIT WITH ORIGINAL SOIL HALFWAY TO THE TOP OF THE ROOTBALL. BREAK UP CLODS OF SOIL. IF SOILS AREPOOR (I.E. HEAVY CLAYS, SAND, OR COMPACTED), BACKFILL CAN BE A MIXTURE OF 1/3 SOIL AMENDMENT MIXED WITH 2/3 ORIGINALSOIL. DO NO USE PEAT AS PART OF BACKFILL IN CLAY SOILS. REMOVE ALL ROCKS AND DEBRIS FROM BACKFILL AND THEN WATERPLANT AND BACKFILLED AREA TO SETTLE PLANTS AND FILL VOIDS.4.REMOVE ALL WIRE BASKETS FROM THE TOP 1/2 OF THE ROOTBALL AND CONTINUE BACKFILLING REMAINING PLANTING PIT WITHORIGINAL SOIL.5.WATER THOROUGHLY A SECOND TIME TO SETTLE PLANTS AND FILL VOIDS WITHIN TWO HOURS OF PLANTING. PLACE SPECIFIEDMULCH WITHIN 48 HOURS OF THE SECOND WATERING. PROVIDE SUPPORT IF NECESSARY.6.STAKING OF TREES SHALL BE THE CONTRACTORS OPTION. THE CONTRACT IS RESPONSIBLE FOR INSURING THAT ALL PLANTINGSARE INSTALLED PLUMB AND REMAIN PLUMB THROUGHOUT THE WARRANTY PERIOD OR 1 YEAR AFTER SUBSTANTIAL COMPLETION,WHICHEVER IS GREATER.7.IF STAKING IS INSTALLED ALL COMPONENTS SHALL BE REMOVED BY THE CONTRACTOR AT THE END OF THE WARRANTY PERIOD.REMOVE EXCESS SOIL / ROOTS FROMTHE TOP OF SOILBALL TO EXPOSE THEFIRST MAIN LATERAL ROOT. PRUNE ALLENCIRCLING ROOTS.EACH TREE MUST BE PLANTED WITH THE FIRSTMAIN LATERAL ROOT AT FINISH GRADE. TREESWITH THE FIRST MAIN LATERAL ROOT NOTVISIBLE WILL BE REJECTED.REMOVE ALL TWINE AROUND THE STEM.VERTICAL SLITS SHOULD BE CUT INREMAINING NON-SYNTHETICBURLAP 16" O.C.ALL SYNTHETIC BURLAP MUST BEREMOVED. TOP 13 OF NON-SYNTHETICBURLAP MUST BE CUT OFF ANDREMOVED COMPLETELY, NOT FOLDEDDOWN.TOP 13 OF WIRE BASKET MUST BECUTOFF AND REMOVED COMPLETELY -DO NOT BEND IT BACK.TREE PLANTING - BALLED & BURLAPPED STOCK1LS-37NOTES:1.SEE BALLED AND BURLAPPED PLANTING STOCK DETAIL FOR FURTHER NOTES.TREE MUST MEET OR EXCEED ANSIZ60.1 (AMERICAN STANDARD FORNURSERY STOCK.) ONE DOMINANTLEADER MUST BE MAINTAINEDTHROUGH THE WARRANTY PERIOD.4" HIGH EARTH SAUCER BEYONDEDGE OF ROOTBALL, FOR 360°.SET ROOTBALL ON 4"-6" MOUND OFUNDISTURBED / NATIVE SOIL TOPREVENT SETTLING.MULCH RING SHOULD BE MIN. 3"DEEP. KEEP MULCH 4" AWAY FROMTRUNK BASE.EACH TREE MUST BE PLANTED SUCHTHAT THE ROOT FLARE IS VISIBLE ATTHE TOP OF THE ROOTBALL ANDLEVEL WITH FINISH GRADE.DIAMETER OF HOLE SHALL BE TRIPLE THEDIAMETER OF THE ROOTBALL. THE SIDESSHOULD SLOPE GRADUALLY.PRIOR TO MULCHING, LIGHTLY TAMPSOIL AROUND THE ROOTBALL IN 6"LIFTS. DO NOT OVER COMPACT. AFTERBACKFILLING, POUR WATER AROUNDROOTBALL TO SETTLE THE SOIL.RUBBER / NYLON STRAPPING TIGHTENEDONLY ENOUGH TO PREVENT SLIPPAGE.FLAG FOR VISIBILITY.FABRIC GUYING STRAPWITH HOSE CHAFINGGUARDAMENDED PLANTING SOIL. SEESPECIFICATIONS FOR DETAILSMETAL STAKES, 2"x24" LONGDRIVEN BELOW FINISH GRADE.DECIDUOUS TREE PLANTING2LS-37SET ROOTBALL ON 4"-6"MOUND OF UNDISTURBED /NATIVE SOIL TO PREVENTSETTLING.METAL STAKES, 2"x24"LONG DRIVEN BELOWFINISH GRADE.DIAMETER OF HOLE SHALL BE TRIPLE THEDIAMETER OF THE ROOTBALL. THE SIDESSHOULD SLOPE GRADUALLY.PRIOR TO MULCHING, LIGHTLY TAMP SOILAROUND THE ROOTBALL IN 6" LIFTS. DONOT OVER COMPACT. AFTERBACKFILLING, POUR WATER AROUNDROOTBALL TO SETTLE THE SOIL.RUBBER / NYLON STRAPPING TIGHTENEDONLY ENOUGH TO PREVENT SLIPPAGE.FLAG FOR VISIBILITY.FABRIC GUYING STRAP WITHHOSE CHAFING GUARDAMENDED PLANTING SOIL. SEESPECIFICATIONS FOR DETAILSTREE MUST MEET OR EXCEED ANSIZ60.1 (AMERICAN STANDARD FORNURSERY STOCK.) ONE DOMINANTLEADER MUST BE MAINTAINEDTHROUGH THE WARRANTY PERIOD.MULCH RING SHOULD BE MIN. 3" DEEP.KEEP MULCH 4" AWAY FROM TRUNKBASE.EACH TREE MUST BE PLANTED SUCHTHAT THE ROOT FLARE IS VISIBLE ATTHE TOP OF THE ROOTBALL AND LEVELWITH FINISH GRADE.4" HIGH EARTH SAUCER BEYOND EDGEOF ROOTBALL, FOR 360°.CONIFEROUS TREE PLANTING6LS-37THIN BRANCHES ANDFOLIAGE (NOT ALL END TIPS)BY 1/3 RETAINING NORMALPLANT SHAPE, THINNING,NOT REQUIRED ONEVERGREENS.MOUND PLANTINGSOIL 4" TO FORMSAUCERREMOVE BURLAP FROMTOP 1/3 OF BALL REMOVECONTAINERIZED PLANTSFROM THEIR CONTAINERSMIXTUREPLANTING SOILEXISTINGGRADE3" MULCH6"12"12"NOTES:1.PLANT SHRUBS IN LOCATIONS PER PLAN AND APPROVED BY LA/E.SHRUB PLANTING3LS-37PLAN3" DEPTH HARDWOODMULCH, SEESPECIFICATIONSPLANTING SOIL MIXTUREPERENNIAL ORGROUND COVER(TYPICAL)4"RECOMMENDEDSPACING12"NOTES:1.PLANT PERENNIALS AND GROUNDCOVERS IN LOCATIONS PER PLAN.SECTIONPERENNIAL & GROUNDCOVER4LS-37METAL EDGE AND MULCH5LS-37NOTES:1.SEE BALLED AND BURLAPPED PLANTING STOCK DETAIL FOR FURTHER NOTES.8" STAPLES TO ANCHOR WEEDBARRIER AT 3' O.C.; 12" O.C. AT SEAMSAS REQUIREDMULCH, TYPE AND DEPTH ASSPECIFIEDWEED BARRIER FABRIC, AS SPECIFIEDMETAL EDGING, AS SPECIFIED.INSTALL ACCORDING TOMANUFACTURER'S SPECIFICATIONSDEPTHVARIESFINISH GRADE, LAWN
The URL can be used to link to this page
Your browser does not support the video tag.