My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
04-11-2024 Planning Commission Packet
>
Agenda Packets
>
2020-2029
>
2024
>
04-11-2024 Planning Commission Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/27/2024 10:56:19 AM
Creation date
9/27/2024 10:37:40 AM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
10
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
5)Existing and proposed drainage and contour plan. The City requires most new lots to <br />have drainage and utility easements located on the front and rear ten feet and the side <br />five feet of the lot. The easements must be reflected on the survey. <br />The applicant has provided a drainage and utility easements as shown on the certificate <br />of survey. The applicant complies with this standard. <br />6)Location and widths of proposed utility easements. <br />The applicant has provided utility easements as shown on the certificate of survey. The <br />applicant complies with this standard. <br />7)Existing street rights-of-way, railroad and utility rights-of-way, parks and other public <br />open space, permanent building and easements within the existing lot and adjoining <br />lots. The applicant has provided existing street rights-of-way as shown on the <br />certificate of survey. <br />8)Areas, other than street and utility easements, that you intend to dedicate for public <br />use, including their areas. There are no other areas intended for public use. <br />9)Scale of the drawing and north arrow. The applicant has provided a north arrow as <br />shown on the certificate of survey. <br />10)Certificate of Survey. The applicant has provided a certificate of survey. <br />Public Hearing: <br />A Minor Subdivision requires a Public Hearing, and the City Council will open the hearing at <br />their April 24, 2024, meeting to take comments from the public. At that time, they will consider <br />the comments from the public and the Minor Subdivision application from the Planning <br />Commission. Public hearing notice letters were sent to addresses within 350 feet of the parcel well <br />as to the Pioneer Press for publication. <br />RECOMMENDED ACTION <br />To recommend approval of a Minor Subdivision, Lot Line Adjustment located at 99 South Owasso <br />Blvd, Parcel ID Number: 06-29-22-22-0008.
The URL can be used to link to this page
Your browser does not support the video tag.