My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
07-22-09 Additions
>
City Council Packets
>
2000-2009
>
2009
>
07-22-09 Additions
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/23/2009 7:46:48 AM
Creation date
7/23/2009 7:45:25 AM
Metadata
Fields
Template:
General
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
31
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
2009 Street Improvements Page 2 <br />F City of Little Canada <br />REASON FOR THIS MEETING <br />^ The City received competitive bids on the '09 Mill & Overlay project, resulting in <br />cost savings for the City and individual property owners. Approximately 30% to <br />40% savings was seen from estimated costs. <br />^ City is looking at increasing the work originally bid by 25% due to competitive <br />pricing. <br />^ Valento Lane has settlement of bituminous at the curb and cracking is becoming <br />more severe due to street age. <br />^ A mill and overlay is necessary now or in the near future to prolong the street life <br />and higher improvement costs in the future. <br />PROPOSED IMPROVEMENTS <br />^ Mill & Overlay from LaBore Road to Allen Avenue <br />- Mill and Overlay 1 'h". Reestablish the crown for drainage to curb. <br />- Minor curb and gutter replacement. <br />- Some street patching may be necessary in areas of worst deterioration. <br />^ Seal coating and crack sealing of the streets was reviewed. Due to declining <br />drainage characteristics staff is recommending a higher level of maintenance (i.e. <br />mill and overlay) to reestablish good drainage and protect the street. <br />
The URL can be used to link to this page
Your browser does not support the video tag.