My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
11-13-2024 Workshop Packet
>
City Council Packets
>
2020-2029
>
2024
>
11-13-2024 Workshop Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/12/2024 5:24:06 PM
Creation date
12/12/2024 5:11:31 PM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
104
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
4. Mandating Action and Accountability <br />Aforementioned, ten years of capital improvements are included in this CIP in order to identify if sufficient <br />revenues are available to fund the ongoing replacement needs of the city into the future. Additional <br />funding sources such as property taxes, grants, intergovernmental revenue, donations, or debt issuance <br />will be needed to fund all of the identified projects in the next ten years. This is especially evident in the <br />General Capital Improvements Fund and the Infrastructure Capital Project Fund. Other options are to <br />delay projects or reduce the project budgets in these funds. <br /> <br />Every effort has been made to draft the document as conservatively and realistically as possible while <br />maintaining the integrity of the funds. The concept of the fund integrity includes accounting for project <br />costs in the funds that have been designated for those costs to occur. <br /> <br />Currently the City tracks its CIP in six different Capital Project Funds and one Enterprise Fund for storm <br />water related projects. The Stormwater Fund is a new fund that has been implemented beginning in 2024. <br />The Capital Project Funds are used to account for the financial resources to be used for the acquisition or <br />construction of major capital facilities and to track projects by each type, and are as follows: <br /> <br />• General Capital Improvement Fund (400) <br />• 10% Charitable Gambling Fund (408) <br />• Infrastructure Capital Project Fund (450) <br />• Park Land Acquisition Fund (456) <br />• Fire Equipment Fund (457) <br />• Storm Water Enterprise Fund (603) <br />• Water/Sewer Replacement Fund (604) <br /> <br />Note: The Storm Water Fund 603 has been implemented as a standalone enterprise fund beginning of <br />2024 and will be reported in the Financial Statements as its own fund. The City decided to add this fund <br />to identify and present separately all the projects that relate to storm water management and <br />infrastructure for ease of tracking and to closely monitor storm water infrastructure needs. Previously, all <br />the storm water CIP projects were expensed and recorded in the Infrastructure Capital Project Fund 450. <br />Beginning with 2024 these projects have been funded with revenues generated from the stormwater <br />utility fee that has been added to the existing water and sewer utility bill. <br /> <br />If a project that has been identified in the CIP is not completed, the unspent funds stay in the Fund. In <br />addition, the City has several TIF Capital Project Funds. These TIF funds are currently budgeted on an <br />annual basis per their respective TIF Plans and Development Agreements. <br /> <br />General Capital Improvement Fund (400) <br />Background: <br />The General Capital Improvement Fund was established to fund capital improvements and acquisitions <br />that are not accounted for in another Capital Project Fund. These improvements have historically been <br />building improvements, public works equipment, and parks improvements. Typically, the expenditures in <br />this fund have included the purchase of tangible personal property (equipment) or facilities used in the <br />City operations. <br /> <br /> <br />2
The URL can be used to link to this page
Your browser does not support the video tag.