My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
12-18-2024 Council Packet
>
City Council Packets
>
2020-2029
>
2024
>
12-18-2024 Council Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/19/2024 4:43:22 PM
Creation date
12/19/2024 4:41:57 PM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
183
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br /> <br /> STAFF REPORT <br />1 <br /> <br /> <br /> <br /> <br />TO: Mayor Fischer and Members of the City Council <br /> <br />FROM: Eric Seaburg, P.E., City Engineer <br /> <br />DATE: December 18, 2024 <br /> <br />RE: Improvement Hearing – 2025 Street Improvements <br /> City Project Nos. 2025-PW41, 2025-PW79 & 2025-PW80 <br /> <br />ACTION TO BE CONSIDERED: <br />Motion to approve resolutions ordering the improvements and preparation of plans and specifications. <br /> <br />BACKGROUND: <br />The following roadways are included in the City’s 10-year Capital Improvement Plan and 15-Year <br />Pavement Management Plan as 2025 projects: <br /> <br />• Nadeau Road, City Project No. 2025-PW41 <br />o Country Drive to Condit Street <br /> <br />• Maple Leaf Court, City Project No. 2025-PW79 <br />o County Road D to Cul-de-sac <br /> <br />• Stoneridge Court, City Project No. 2025-PW80 <br />o County Road D to Cul-de-sac <br /> <br />These projects are predominantly pavement-focused with spot improvements proposed to the curb <br />and gutters and underground utility systems. A feasibility report detailing the proposed projects has <br />been prepared. The bullet points below highlight each of the proposed improvements: <br /> <br />• Street Improvements <br />Full-depth reclamation and paving is proposed for the roadways. The curb and gutter will be <br />removed and replaced in areas where it is damaged or settled. <br /> <br />• Watermain & Sanitary Sewer Improvements <br />Consistent with past projects, the underground watermain and sanitary sewer utility systems <br />have been reviewed for overall condition and long-term integrity. The systems are in good <br />condition and are proposed to be left in place. Minor improvement will be made to each <br />system to ensure reliability. <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.