Laserfiche WebLink
~zNUTrs <br />City Counci7. <br />May 9, 1984 <br />Canabury Mr. Carley reported that the project goin~ in in this area is a <br />(Cont.) sewer force main. IT. will pump water from Sleepy I~ol.lo~v to Savage <br />Lake. After the main is installed, the blaclctop wi11 be put back, <br />and along the highway fence the blacl<top will be repiaced with a <br />blacktop burm and gutter so that water will run clown the streec. <br />At least 90% of the street wi11 be overlayecl. <br />The En~;ineer reported [hat a few meetings ago the idea of a catch <br />basin at a cost of. $3,500 was cliscussed and the Itomeowners Association <br />was contacted for payment of this cost. <br />The Engineer also reported that no curbing will be done on the <br />condo's side of the street. The Engineer pointeci out that since the <br />State Fli.~hway Department is participating in this cost, they ar.e <br />governing the impr.ovements that can be m2cie. <br />T4r. Rocoland pointed out the w~y the street leans and felt that a <br />Large wash-out would be caused by water crossing the street. <br />Mr. Rowland also felt that the Condominiums should have the same <br />quality of street as there is on Demont near the Glasrud Apartments. <br />Mr. Ro~alancl pointed out thaC the condos pay ~50,000 annually i.n taxes <br />and they felt that they shoul<1 not have to participate in any costs. <br />Mr. Rowland also pointed out thaC ~shere is a drainage problem on the <br />corner of Vilcin~ Drive and Demont that i.s hazardous. <br />Mr. Ro~oland point.ect out that the condominium is upgrading i.ts grounds <br />and they keep up their property in the Ci.ty. <br />Mrs. Scalze pointed out that the City has never overlaid streets as <br />a poli.cy and only has done so in connection wi[h water projects. <br />Scalze stated that the City does not have the money to overlay streets <br />and if it ctid, taxes would be much higher. <br />Mr. Rowland stated that the Council discussecl upgrading the road to <br />the point ~ohere water will ilo~v. Mr. Porsberg repli.ed that the <br />City did agr.ee to repair. the curbi.ng along the street. <br />Mr. CarLey sCated that he will meet wi.th Mr. Rowland so that he can <br />point out exactly what the condomi.nium wants done. Mr. Rowland stated <br />[hat ther.e needs to be a hole in the burm so that water can flow onto <br />the Highway Department property. t4r. Carley stated that thi.s is a <br />sma11 matter an~~ can be done. <br />The ]sn~;ineer stated that the $3,500 catch basi.n would tal<e care of the <br />puddle on the corner. Mrs. Nardini aslced i£ this could be included <br />in repairs to be made by the County during the talce-over process. <br />The I:ngineer stated that it could be done then, buc did not know when <br />the City would talce over Demont. <br />Page -2- <br />