My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
08-30-90 Council Special Minutes
>
City Council Meeting Minutes
>
1990-1999
>
1990
>
08-30-90 Council Special Minutes
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/3/2009 3:03:29 PM
Creation date
7/31/2009 2:53:35 PM
Metadata
Fields
Template:
General
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
8
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
MINUTES <br />CITY COUNCIL <br />AUGUST 30, 1990 <br />Jim Beckwith, Kraus-Anderson presented the Council with <br />bid results for the Fire Station and City Center <br />remodeling projects. <br />Beckwith began a detailed review of this document <br />beginning with the Fire Station project. Beckwith <br />recommended that the low bids be awarded in all <br />categories except the following: <br />Retaining Walls - Only one bid was received, <br />which Beckwith indicated was over estimate. <br />Beckwith recommended that Retaining Walls be <br />rebid with the Landscape Package. <br />Lawns/Sodding - Only one bid was received. <br />Again, Beckwith recommended that this item be <br />rebid with the Landscape Package. <br />Rough Carpentry/Material - The low bid was not <br />complete as it did not include lumber paneling or <br />V-groove siding. Therefore, Beckwith recommended <br />that the next low bid be awarded. <br />Finish Carpentry/Materials - Beckwith recommended <br />withholding the award of bid for this section until <br />he can obtain itemized bid breakdowns from the <br />bidders to ensure that the bids are complete. <br />Hollow Metal Frames & Finish Hardware - The low <br />bid was not completed, therefore, Beckwith <br />recommended that the next low bid be awarded. <br />Special Flooring - Beckwith requested a delay <br />in awarding this bid since he would like to have <br />an opportunity to review the various products <br />being proposed. <br />Mechanical - Beckwith recommended delaying the <br />awarding of this bid. Beckwith reported that two <br />vendors bid complete mechanical packages, however, <br />many bid only portions of the mechanical package. <br />He needs an opportunity to review the partial bids <br />to determine if there are combinations of these that <br />will make a complete mechanical package. If so, <br />these can then be compared with the two complete <br />bid packages received. <br />Page 2 <br />
The URL can be used to link to this page
Your browser does not support the video tag.