My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
03-12-2025 Council Packet
>
City Council Packets
>
2020-2029
>
2025
>
03-12-2025 Council Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/9/2025 12:49:39 PM
Creation date
4/9/2025 12:45:35 PM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
95
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br /> <br /> STAFF REPORT <br />1 <br /> <br /> <br /> <br /> <br />TO: Mayor Fischer and Members of the City Council <br /> <br />FROM: Eric Seaburg, P.E., City Engineer <br /> <br />DATE: March 12, 2025 <br /> <br />RE: Interstate 35E Pedestrian Bridge – FY ’26 Congressionally Directed Funding Request <br /> <br />BACKGROUND: <br />City staff have been working for several years to develop possible improvement projects to address <br />safety and congestion along Little Canada Road between Lakeshore Avenue and I-35E. This work <br />has been done in coordination with Ramsey County, MnDOT and FHWA staff, all of which have <br />jurisdictional authority on adjacent roadways. The following four projects are now programmed for <br />construction and are shown on the attached map: <br /> <br />• County Road C <br />o 4-lane to 3-lane conversion <br />o Pedestrian improvements <br />o Lexington Avenue in Roseville to Little Canada Road <br />o 2022 Highway Safety Improvement Program Grant Award (FY 2026) <br /> <br />• Lakeshore Avenue / Little Canada Road/ County Road C Intersection <br />o Conversion of all-way stop to roundabout <br />o Pedestrian improvements <br />o 2022 Highway Safety Improvement Program Grant Award (FY 2026) <br /> <br />• Country Drive / Little Canada Road / Interstate 35E Intersections <br />o Conversion of two signalized intersection into a single roundabout <br />o Congestion and safety improvements <br /> <br />• 35-E Interchange Signal Replacements <br />o Upgrades to signals, mast arms, and controller equipment <br />o Opportunity to reprogram to increase efficiency <br />o Delayed by MnDOT staff until 2027 while Little Canada Road improvements vetted <br /> <br />PEDESTRIAN BRIDGE: <br />In addition to the four programmed projects noted above, project staff have been seeking outside <br />grant funding to include a pedestrian bridge over Interstate 35E as the next phase of the projects listed <br />above. The grade separated trail crossing over Interstate 35E is identified as a desired improvement in <br />the City’s Comprehensive Plan, as well as the City’s adopted Sidewalk and Trail Map, which is <br />attached for reference. <br />
The URL can be used to link to this page
Your browser does not support the video tag.