Laserfiche WebLink
<br />Ramsey County | Multi-Jurisdiction Hazard Mitigation Plan 138 <br />Action <br />Number Jurisdiction <br />Mitigation Action <br />Name <br />What is the problem <br />the action is solving? How does the action solve the problem? <br />Is this a <br />continuing <br />action from <br />2019 plan? <br />Action <br />Status <br />57 Saint Paul <br />Flood Mitigation - <br />Mechanical Gate <br />The mechanical gate <br />prevents water entry, <br />reducing the need for <br />expensive post-flood <br />repairs and clean-up <br />efforts. The <br />mechanical gate helps <br />ensure continuous <br />operations by <br />preventing water <br />intrusion. <br />Mechanical gate used as a levee system to <br />block water from infrastructure No Not Started <br />58 Saint Paul Flood Mitigation <br />Addresses problems <br />related to erosion, <br />structural damage, <br />navigation hazards, <br />maintenance costs, <br />public safety, and <br />environmental <br />protection, ensuring <br />the long-term <br />resilience of the <br />bridge and <br />surrounding area. <br />Raspberry Island - Bridge Deflector Project <br />needed. Develop plan and complete <br />programming and construction Yes Not Started