My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
07-23-2025 Council Packet
>
City Council Packets
>
2020-2029
>
2025
>
07-23-2025 Council Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/14/2025 3:48:20 PM
Creation date
8/14/2025 3:13:10 PM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
140
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
QUANTITY TRACKING BY AREA2025 STREET IMPROVEMENTSCITY OF LITTLE CANADA, MNBMI PROJECT NO. 24X.13577200DATE: 7/16/2025QUANTITY COST QUANTITY COST QUANTITY COST QUANTITY COST QUANTITY COST QUANTITY COST QUANTITY COST QUANTITY COSTPART 1: STREETS1 TRAFFIC CONTROL 0.5 LS $3,259.04 1,629.52$ 0.167 $543.17 0.167 $543.17 0.167 $543.172 EROSION CONTROL SUPERVISOR LS $1,828.87 -$ 3 STORM DRAIN INLET PROTECTION 6 EA $183.63 1,028.33$ 0.8 $146.90 1.6 $293.81 3.2 $587.624 STREET SWEEPER (WITH PICKUP BROOM) HR $185.51 -$ 5 MOBILIZATION1 LS $25,000.00 12,500.00$ 0.167 $4,166.67 0.167 $4,166.67 0.167 $4,166.676 REMOVE CONCRETE CURB AND GUTTER (SPOT REPAIR) 512 LF$13.87 7,101.44$ 150 $2,080.50 250 $3,467.50 112 $1,553.447 SAWCUT BITUMINOUS PAVEMENT 160 LF $2.50 400.00$ 34 $85.00 23 $57.50 103 $257.508 SAWCUT CONCRETE PAVEMENT LF $4.22 -$ 9 EDGE MILL BITUMINOUS SURFACE 174 SY $3.01 523.74$ 174 $523.7410 REMOVE BITUMINOUS PAVEMENT - DRIVEWAY SY $12.90 -$ 11 REMOVE BITUMINOUS PAVEMENT - TRAIL 88 SY $13.25 1,166.00$ 88 $1,166.0012 REMOVE CONCRETE PAVEMENT - DRIVEWAY SY $20.24 -$ 13 WATERMGAL $15.00 -$ 14 GRUBBINGLS $2,005.56 -$ 15 CLEARING AND GRUBBINGLS $250.70 -$ 16 TREE TRIMMINGLS $150.42 -$ 17 COMMON EXCAVATION - TRAIL CY $55.65 -$ 18 SUBGRADE EXCAVATION (SPOT CORRECTION) CY $29.47 -$ 19 SUBGRADE CORRECTIONCY $15.00 -$ 20 FULL DEPTH RECLAIMATIONSY $6.45 -$ 21 FINISH GRADINGSY $2.10 -$ 22 SALVAGE AND INSTALL EXCESS RECLAIM MATERIAL (AGGREGATE BASE) CY $2.44 -$ 23 JOINT ADHESIVE (MASTIC)LF $0.80 -$ 24 BITUMINOUS MATERIAL FOR TACK COAT GAL $2.01 -$ 25 TYPE SP 9.5 WEARING COURSE MIXTURE (2,C) (PATCHING) SY $42.00 -$ 26 TYPE SP 9.5 WEARING COURSE MIXTURE (3,C) TON $102.00 -$ 27 TYPE SP 12.5 WEARING COURSE MIXTURE (3,C) TON $93.00 -$ 28 CONCRETE CURB AND GUTTER (SPOT REPAIR) 541 LF $30.0816,273.28$ 165 $4,963.20 264 $7,941.12 112 $3,368.9629 6" CONCRETE DRIVEWAYSY $135.38 -$ 30 6" CONCRETE PEDESTRIAN CURB RAMP SF $10.03 -$ 31 TRUNCATED DOMESSF $75.21 -$ 32 COMMON TOPSOIL BORROW 34 CY $74.00 2,516.00$ 14 $1,036.00 14 $1,036.00 6 $444.0033 SODDING TYPE LAWNSY $15.00 -$ 34 APPLICATION OF WATER FOR TURF ESTABLISHMENT MGAL $281.28 -$ 43,138.31$ 14,187.44$ 17,505.77$ 10,921.36$ -$ -$ -$ 523.74$ -$ 35 PATCH DOGHOUSE (SANITARY) EA $404.0836 RECONSTUCT INVERT (SANITARY) EA $404.0837 CHIMNEY SEAL (INFI-SHIELD)EA $174.1338 NEW RINGS AND CASTING (SANITARY) EA $1,184.4439 REMOVE FRAME AND RING CASTING (SANITARY) EA $308.4540 ADJUST VALVE BOXEA$397.89SPOONER PARKINGLOT2025-PARKS-11SPOONER TRAIL2025-PARKS-14PIONEER PARKINGLOT2025-PARKS-25VEG RESTORATION2025-PARKS-54SPRUCE SINKHOLENADEAU2025-PW-41STONERIDGE2025-PW-80MAPLE LEAF2025-PW-79PART 1: CONSTRUCTION SUBTOTAL =PART 2: SANITARY SEWERPART 2: CONSTRUCTION SUBTOTAL =TOTAL COSTITEM NUMBERPART 3: CONSTRUCTION SUBTOTAL =ITEM DESCRIPTIONPROJECT TOTALUNITAS BID UNIT PRICEPART 3: WATERMAIN7/16/2025, 3:20 PMQUANTITY TRACKINGBolton & Menk, Inc.Page 1 of 4
The URL can be used to link to this page
Your browser does not support the video tag.