Laserfiche WebLink
EXHIBIT B <br />GENERAL CONSTRUCTION FEE SCHEDULE AMENDMENTS <br /> <br />BUILDING PERMIT FEES <br />Value Range Fee <br />$1 - $500 $29.50 <br />$501 - $2,000 $28.00 for the first $500 plus $3.70 for each additional $100, or <br />fraction thereof, to and including $2,000 <br />$2,001 - $25,000 $83.50 for the first $2,000 plus $16.55 for each additional $1,000, <br />or fraction thereof, to and including $25,000 <br />$25,001 - $50,000 $464.15 for the first $25,000 plus $12.00 for each additional <br />$1,000, or fraction thereof, to and including $50,000 <br />$50,001 - $100,000 $764.15 for the first $50,000 plus $8.45 for each additional <br />$1,000, or fraction thereof, to and including $100,000 <br />$100,001 - $500,000 $1,186.65 for the first $100,000 plus $6.75 for each additional <br />$1,000, or fraction thereof, to and including $500,000 <br />$500,001 - $1,000,000 $3,886.65 for the first $500,000 plus $5.50 for each additional <br />$1,000, or fraction thereof, to and including $1,000,000 <br />$1,000,001 and up $6,636.65 for the first $1,000,000 plus $4.50 for each additional <br />$1,000 <br /> <br />Solar Panel Installation-residential $200.00 (flat fee) <br />Plan Check Fee Up to 65% of the calculated permit fee <br />State Surcharge .0005 x the value of the job <br /> <br />• Plan review fees for similar building plans = 25% of normal building permit fee. <br />• Work commencing before permit issuance = 100% of normal building permit fee. <br />• Fee refunds – upon written application not more than 80% of building permit fee and 80% of <br />plan review fee when plans are withdrawn or cancelled before review is done. <br />• Inspections outside of normal business hours = $50.50 per hour (minimum of two hours). <br />• Reinspections = $75.00 per each required reinspection <br />• Sod escrow (if turf is not established at time of occupancy) = $2,000.00 <br />• Demolition – Fee based on valuation. Contact MN Pollution Control and Ramsey County <br />Environmental Health ten (10) days prior to actual demolition. <br /> <br />MECHANICAL PERMIT FEES <br />Commercial <br />Base Fee $60.00 (charged in addition to the permit fee) <br />Permit Fee Project value* x 1.50% <br />State Surcharge Project value* x .0005 <br />Residential <br />Furnace (includes duct work) $80.00– New <br />$60.00 – Replacement <br />$40.00 – Unit heaters <br />Air Conditioning $60.00 – New <br />$40.00 – Replacement