My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
06-09-10 Additions
>
City Council Packets
>
2010-2019
>
2010
>
06-09-10 Additions
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/18/2010 9:22:17 AM
Creation date
6/18/2010 9:20:03 AM
Metadata
Fields
Template:
General
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
16
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Petroleum Tank Release Cleanup Fund <br /> ` Standardized Proposal and Invoice Form <br /> Limited fife Inve~tigafion (LSI) <br /> or dull ~iemedial Inve~tigagion <br /> <:~~3'.;~,'~~' ~ons4afldard scope og UV®rrk <br /> MPCA Leak tlF 17991 <br /> Applican4 Name City of Ullle Canada Site Name L:illle Canada PuUlic Works Shop_ _ _ <br /> Addl'8SS G1 G I ittle Canada Roatl Site Addfess 3100 Country (hive _ <br /> Lillie Canada, MN 65717 Lillie Canada, MN 5511'/ <br /> 'T'ask Uoscriptlon Amount Proposod Amount Invoicod for <br /> Proposod Tasks <br /> <br /> Adm6tlatratlvo'fasks~ <br /> Agency status update 5105 per field work event _ S <br /> Applicant status update [drillinq~ $.57?. per drilling event SII0.00 S _ <br /> Applicant status update [quarterly sanytling) 5154 per quarterly sampling event $ $ <br /> t3ackground review 5616 per leak site S <br /> Drum disposal manaycment S30b per disposal 5 5 <br /> Field work notification and scheduling 5209 per field work event/see rule 5160.00 S <br /> Health and sate( flan _ <br /> Y t 5275 per leak rile S <br /> Nonspecific administration 5770 per step of services _ _ 560 00 $ <br /> _ <br /> Off-site access time $1,100 per required off-site property 5 <br /> Sample shipping and Transportation $99 per shipping event 575.00 $ <br /> State duty officer emergency contact 5105 per call $ S <br /> Consultan4l7rllllny and F.xcavatlon Actlvitlos _ <br /> Urillitty oversiyht, field lag prep, & soil sampling [2~ or shallower boring] 5165 per boring $760.00 S <br /> Drilliny oversiyht, field log prep, & soil sampliny (boring deeper than 2.v ~ 57 per fool 5195.00 S <br /> Free product recovery through hand bailing or portable pump 5116 per well per event S S <br /> Hydraulic conductivity field test 5154 per nee. tested well $ 5 <br /> Moni(oriny well installation oversighl & development [up to 2 hrs.] $30II per well 5 5 ~ _ _ <br /> Monitoring well installation oversight & development (beyond 2 hrs] $462 per wall S S <br /> Monitoring well sealing oversight $7"7 per well $ <br /> Surve inc &curve in, e<ui orient 5209 ter curve inr event ~ 565.00 <br /> Y J Y 9 { 1 I Y 1 ~ <br /> _ <br /> Surveying & surveying equipmont picensed pro surveyor necessary] 5II75 per surveyin-g event $ _ _ 5 <br /> Temporary vrell installation oversighl [7v or shallmver well] 5165 per well S S <br /> Temporary well installation oversight [w811 deeper than 2v ] 57 per foot S <br /> Utility Uackfill investigation 577 per hand auger bonny $ _ _ S <br /> Utility clearance 5720 per utikly clearance event S 5 _ <br /> Utility clearance (private utility locator necessary] g550 pet clearance event S_ 100 00 S ~ _ <br /> Plold and Rscop¢or Surveys _ <br /> Karst field survey $7,17II 5 5 <br /> Surface water receptor survey and risk evaluation $154 per leak site 50.00 5 _ _ <br /> Vapor receptor survey and risk evaluation 5'770 per leak site plus: 565.00 5 _ <br /> • citizen contact (beyond II] • $19 each of of add9 contacts: <br /> • subsurface monitoring point [Ueyond II] • $39 each i1_of add I pis <br /> Water well receptor survey and risk evaluation 5625 per leak site plus: 565.00_ S <br /> • citizen contactor property surveyed (Ueyond 15J • 539 each a or a0d'I_cc or ps: m <br /> Sampling <br /> AST soil sampling 539 per sample on chaimof-custody 5 S <br /> Composted soil sampling 577 per sampling avert $ _ $ <br /> Contaminated stockpile soil sampliny S39 per sample on chain-of-custody S S _ _ <br /> Excavation soil sampling [tank being removed or abandoned] S77/tank * $3.b5/cy excavated S 5 _ _ <br /> L=xcavation soil sampling (tank not being removed or abandoned] 51.54 per cubic yard excavated 5 S <br /> [xcavation soil sampling test pit excavation) S77 per test pit 5 5 _ <br /> Groundwater sampling (permanent monitorin-g welq 5135lwcll per sampling event 5_ 5 <br /> Groundwater sampling (other than permanent monitoring well) S39 per sampling point 565.00 S <br /> I-and-treated soil cam tlin 577 ter cam lint event $ S <br /> • See Minn. Rides, Chapter 2aad for conydefe inlormalion.'fhese values am summarized oral are Doty a guide. <br /> Page 1 of 3 7/2006 <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.