Laserfiche WebLink
ITEM ORIGINAL CONTRACT THIS PERIOD TOTAL TO DATE <br /> N0. ITEM DESCRIPTION UNIT QTY. UNIT PRICE QTY. TOTgI PRICE QTY. TOTAL PRICE <br /> <br /> ' SCHEDULE 60~CHANGE ORDER dt _ <br /> __)___-SPEC. _iREMOVE BREPtACE CATCHDASIN F.ACH 200__ 3.12500 C.00 SO.CO 2.G0 56.250.00 <br /> t-_._.-___-__-__._____..____.W.._-.-.._..._~_...__ <br /> 2 SPEC REMOVE SREPU~GE STORl9 PIPF, NJ/iJ."CMP LF 3000 6d 00 000 SO.OD d8.00 $3.264.C0 <br /> 3 SPEC REPLACE RwG$AND GROUT STRUCTURES EACH 5.00 2E0001~~ SOHO S.GO_ 5: 26OC0 <br /> SPEC RfGROVi STRUCTURES EACH )00 ~^t20.00 000 5000 1.00 5120 CO <br /> SCI1[OULE G.0-CIfANGE DRD@R nt-TOTAL 5000 810,934.00 <br /> BIO SDMtAAflY TNI.I'P[RI D TOTAL TOOATE <br /> SCHEDULE I.0-ALLEN AVENUE-TOTAL 538,638.]4 594,6]3A6 <br /> SCHEDULE 20-VALENTO LANE-TOTAL S22S00 637,16].90 <br /> SCHEDULE 3.0 ~ SYLVAN STREET ~ TOTAL 63,066.00 846,8)1.86 <br /> SCHEDULE M1.0-SCHLETTY DRIVE-TOTAL S]31.00 524,243.3> <br /> SCHEDULE 5.0-SUNRISE DRIVE-TOTAL St,046d4 536,]15.4> <br /> SCHEDULE 6,0-CHANGE ORDER pi~TOTAI 50.00 510,884.00 <br /> TOTAL BID SDMMARY THIS PERIOD 532•$46,69 <br /> TOTAL 610 SUMMARY TO DATE 3180,4]6.02 <br /> TOTAL THIS PERIOD TOTAL TO DATE <br /> Ah1OUNT EARNED 532,646.C8 5160 ~)G 02 <br /> AN.OUNT RETAINED $1,62%.30 59.023.80 <br /> MATERIgL ON SITE 50.00 5000 <br /> JAATERIAL DEDUCT, 30.00 5000 <br /> PREVIOUS PAYMENTS $140.533A4 <br /> AflOUNT DUE SSQ.9t8.)S SS0,91810 <br /> 4 <br /> <br />