Laserfiche WebLink
<br /> ITEM ORIGINAL CONTRACT THI3 PERIOD TOTAL TO GATE ' <br /> N0. ITEM DESCRIPTION UNIT DIV. UNIT PRICE QTY. TOTAL PRICE QTY. TOTAL PRICE ' <br /> SCHED E60- G RDER bi <br /> t SPEC REMOVEBREPLAGE CATGHEASIN EACH 200 3,12500 .-_0:00_ 5000 200 56.250.00 <br /> 2 SPEC REMOVE &REPLACE STORM PIPF. Wlf2°CMP LF 30.00 G800 0.00 50.00 48.00 33,26A 00 <br /> 3 SPCC REPLACE RINGS AND GROUT STRUCTURES EACH 5.00 250.00 0.00 50.00 5.00 61.250.00 <br /> 4 SPEC REGROUT STRUCTURES EACH ]00 120.00 0.00 50.00 1.00 6120.00 <br /> SCHEDULE 6.0•CHANGE ORDER p1-TOTAL SO.OO 610.684.00 <br /> SCHEDULE 9.0. ONTARIO STREET - <br /> i 2021.501 MOBILIZATION LS 1.00 $5.030.00 1.00 $5,00000 1 DO 55.00000 <br /> 2 2104.505 REMOVE CONCRETE CURD AND GUTTER LF G9]00 $2.04 125200 52.554.08 1.252.00 $2,554.00 <br /> 3 2105525 TOPSOIL BORROW CY 4000 SI0.20 13.00 513260 1300 5132.G0 <br /> d 2231604 _DITVMINOUS PATCH SPECIAI__ SY G0000 6532G 000 $000 D.OD 5000 <br /> 5 2232.501 MILL DITUl41NOUS PAVEMENT _ _ SY_ _5.86600 SL00 __566800 35,860.00 5,888.00 $S.B6G.00 , <br /> 6 2350.501 TYPE NN4 WEAR COURSE MIXTURE TON ]30.00 36500 ]25 TG 54].1>440 TJ,S]e 64],1]4.49 <br /> 9 2504602 ADJUST VALVE BOX EACH 200 512500 200 525000 2.00 5250.00 <br /> 8 2506.522 ADJUST fRAME ANO RING CASTING EACH 600 316].00 500 3835.00 500 6835.00 <br /> 9 253L50i CONCPETE CURABGVTTER LP 69).00 315.]6 1252.00 519.]3152 1,25200 519.]31 52 <br /> 10 25G360t TRAFFIC CONTROL LG i.OD S1$O0.GO 100 51,500.00 1.00 31.500.00 <br /> 11 25]5.604 SEEDING SY 25000 $222 95.C0 3210.90 9500 6210.90 <br /> 12 _ SPEC _ RING REPLACEMENT BGROUTING _ _ . .EACH _%00_ _ _ 6250.00 _ 8,00 _ 52.000.00 900 $200D.00 <br /> 13 SPEC GROUT STRUCNRE SACH L00 $12000 _ 100 Sf]0.00 100 6120.00 <br /> _1A SPEC GRPDATION TEST, CLASSS _ EACI'._____ 1.00 ____$25.00 0.00 $0.00 0.00 30.0D <br /> 15 SPEC PRC~TOR TEST. CLASSS EACH 1.00 52500_ 000 ___5000 000 ___$0.00 <br /> 16 SPEC DENSITY iESt. BVPLACE EACH 200 52500 OOD 30.00 0,00 50.00 <br /> i% SPEC CONCRETE TESTING EACH 2.00 6150.00 200 S3OD.0D 2.00 5300._00 <br /> 18 SPEC NUCLEAR DIIDMINWSDEIJSITY EACH 600 52500 200 550.00 200 550.00 <br /> 19 SPEC EXTRACTIONIGRADATION EACH 2.C0 S2G00 _ 100 325.00 t00 525.0 <br /> 20 SPEC AIR VOIDS EACH 200 325.00 I W 325.00 L00 525.00 <br /> 6CNEOULE>.0-ONTARIO STREET TOTAL 385714.50 385."1'!4.50 <br /> 8103UMMARY THIS Pf.RIOD TOTAL TO DATE <br /> SCHEDULE IO-ALLEN AVENUE-TOTAL $646.90 $48,2]].89 <br /> 3CHEDUlE 2.0 •VALENTO LANE-TOTAL 5118.80 52],306.90 <br /> SCHEDULE 3.0 •SVLVAN STREET-TOTAL 516,9D8.60 565,980.44 <br /> SCHEDULE 4.0-SCNLETIY DRIVE-TOTAL -S2>6.60 $23,966.]] <br /> SCMEOULE 3.0-SUNRISE DRIVE-TOTAL $12,49.86 $99,690.33 <br /> SCHEDULE 6.0-CHANGE ORDER NI•TOTAL $0.00 $10,564.00 <br /> SCHEDULE ].0.ONTARIO STREET-TOTAL $86,994.50 585,%94.50 <br /> TOTAL BID SUMMARY THIS PERIOD Sti ],245.53 ' <br /> TOTAL BID 3UNMARY TO DATE 5300,800.5> <br /> TOTAL THIS PERIOD TOTAL TO GATE <br /> AMOUNT EARNED 6n>,24555 5300.880.5% <br /> nMOUNT RETAINED $5.862.28 315,044 03 <br /> MATERIAL ON SITE 3000 $0.00 ' <br /> tdATERIAL DEDUCT. SO.DO 50.00 <br /> PREVIOUS PAYMENTS 61)4,4x3.29 <br /> AMOUNT DUE S1 H,38J.2] St 11.383.29 <br /> 4 <br /> <br />