My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
03-07-11 Council Agenda
>
City Council Packets
>
2010-2019
>
2011
>
03-07-11 Council Agenda
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/23/2011 2:28:23 PM
Creation date
3/23/2011 2:24:55 PM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
7
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
March 4, 2011 <br />Fite No. 120119E -0071 <br />Honorable Mayor and City Council <br />City of Little Canada <br />515 Little Canada Road E. <br />Little Canada, MN 55117 -1633 <br />RE: 2009 MILL OVERLAY PROJECT <br />PARTIAL PAY ESTIMATE #7 <br />Dear Council Members: <br />Please find attached 3 copies of Partial Pay Estimate No. 7 for the above referenced <br />project. As you are aware, the Contractor for the project is T.A. Schifsky Sons. The <br />total amount earned by the Contractor on this partial pay estimate is $460,175.34. <br />Subtracting retainage of $1,500.00 and previous payments in the amount of <br />$433,911.88, the amount due the Contractor is $24,763.46. <br />This pay estimate includes payment for all final quantities used on the project. There <br />were some concerns on the wear paving surface on Costa Lane shortly after its <br />completion in 2009 when some pitting occurred in isolated areas. The damage <br />appeared to be caused by foreign material introduced into the mix during paving or <br />poorly mixed bituminous. The entire street has been monitored since that time and no <br />additional unusual deterioration has occurred outside the isolated areas originally <br />identified. We have directed the Contractor to heat the bituminous surface and add <br />bituminous fines to correct the isolated areas and this work will be completed in the <br />spring. At this time we are recommending reducing retainage on the project to <br />$1,500.00 to ensure the work is completed in a timely manner this spring. We have <br />inspected the work preformed by T.A. Schifsky Sons and find it to be in compliance <br />with the plans, specifications, and contract documents. Therefore, we would <br />recommend approval of Partial Pay Estimate No. 7 in the amount of $24,763.46. <br />If you have any questions regarding this issue please feel free to call. <br />Sincerely, <br />ELFERING ASSOCIATES <br />1 <br />aaggRING OSSO(I41T. S <br />Lee Elfering, P.E. <br />City Engineer <br />cc: Bill Dircks, Public Works Director <br />Ltr- 030411 -CC (Payment 1/7 Mill Overlay) <br />10062 Flanders Court NE, Blaine, MN 55449 Phone: (763) 780-0450 Fax: (763) 780 -0452 <br />
The URL can be used to link to this page
Your browser does not support the video tag.