Laserfiche WebLink
1 <br />2021501 <br />MOBILIZATION <br />LS <br />1.00 <br />52.500.00 <br />0.00 <br />50.00 <br />1.00 <br />52,500.00 <br />2 <br />2104.505 <br />REMOVE CONCRETE CURB AND GUTTER <br />IF <br />400.00 <br />62.03 <br />4500 <br />506.00 <br />446.00 <br />5696.00 <br />3 <br />2731004 <br />BITUMINOUS PATCH SPECIAL <br />SY <br />SY <br />5,000.00 <br />2850.00 <br />510.00 <br />51.00 <br />0,00 <br />0,00 <br />1587 <br />00.00 <br />50.00 <br />5920,46 <br />0.00 <br />27.00 <br />0000 <br />527.00 <br />4 <br />2232.501 <br />MILL BITUMINOUS PAVEMENT <br />502,53 <br />529,146.74 <br />5 <br />2350501 <br />TYPE MV4 WEAR COURSE. MIXTURE <br />TON <br />03000 <br />55800 <br />6 <br />2504602 <br />ADJUST VALVE BOX <br />EACH <br />200 <br />5125.00 <br />000 <br />50.00 <br />0.00 <br />5000 <br />7 <br />2506.522 <br />ADJUST FRAME AND RING CASTING <br />EACH <br />4,00 <br />520000 <br />0.00 <br />60.00 <br />7.00 <br />51.40000 <br />1 .1 a, <br />2531.501 <br />2563601 <br />CONCRETE CURB 8, GUTTER DESIGN 8618 <br />TRAPF IC CONTROL <br />LE <br />0.5 <br />40000 <br />1.00 <br />51650 <br />506980 <br />000 <br />000 <br />500044800 <br />5000 <br />1.00 <br />07,09000 <br />5069.80 <br />10 <br />2573.53 <br />INLET PROTECTION (NlMCO) <br />6AC11 <br />SY <br />2.00 <br />225.00 <br />514000 <br />5180 <br />0.00 <br />000 <br />5000 <br />50.00 <br />2.00 <br />158,00 <br />528000 <br />528440 <br />11 <br />2575604 <br />SEEDING <br />SCHEDULE 5.0- WINDROW DRIVE TOTAL 51036.46 542,795.94 <br />SCHEDULE 6.0- CHANGE ORDER d 1, <br />1 <br />2104505 <br />REMOVE BITUMINOUS <br />SY <br />903800 <br />111746 <br />$100 0.00 <br />551681 0.00 <br />592] 000 <br />ORDER d1 -TOTAL <br />30.00 <br />5000 <br />903800 <br />511]40 <br />59.030.00 <br />564955.09 <br />2 <br />2350501 <br />TYPE MV3 BASF COURSE MIXTURE <br />TON <br />3 <br />2211501 <br />AGGREGATE BASE 014605, ROAD <br />TON <br />SCHEDULE <br />25692 <br />6.0 CHANGE <br />50 <br />50.00 <br />2)43) <br />52.542.9 <br />676.03004 <br />1 <br />2021,501 <br />SCHEDULE I0- VALENTO LANE <br />MOBILIZATION <br />0.5 <br />1.00 <br />5250000 <br />000 <br />000 <br />5000 <br />5000 <br />1.00 <br />496.00 <br />52.600.00 <br />5992.00 <br />2 <br />2104.505 <br />REMOVE CONCRETE CURB A140 GUTTER <br />LE <br />400.00 <br />5800 <br />3 <br />2231604 <br />BITUMINOUS PATCH SPECIAL <br />SY <br />1000.00 <br />51000 <br />0.00 <br />0.00 <br />6.50 <br />5000 <br />5000 <br />537700 <br />0.00 <br />4434.00 <br />48003 <br />50.00 <br />54,434.00 <br />528,39854 <br />4 <br />2232.501 <br />MILL BITUMINOUS PAVEMENT <br />SY <br />285000 <br />51,00 <br />0 <br />2350501 <br />TYPE MV4 WEAR COURSE MIXTURE <br />TON <br />63000 <br />55800 <br />G <br />2504602 <br />ADJUST VALVE BOX <br />EACH <br />2.00 <br />5125.00 <br />0.00 <br />5000 <br />000 <br />50.00 <br />7 <br />2506.522 <br />ADJUST FRAME AND RING CASTING <br />EACH <br />4.00 <br />5200.00 <br />0.00 <br />50.00 <br />4,00 <br />5800.00 <br />6 <br />2531101 <br />CONCRETE CURB GUTTER 0091094 0018 <br />LF <br />400.00 <br />516,50 <br />0.00 <br />50.00 <br />496.00 <br />5019400 <br />9 <br />2503001 <br />TRAFFIC CONTROL <br />LS <br />1.00 <br />5009.80 <br />0.00 <br />80.00 <br />1.00 <br />5960,00 <br />1 0 <br />2573.53 <br />I11197 PROTECTION (040100) <br />EACH <br />200 <br />514000 <br />0.00 <br />0.00 <br />50.00 <br />5000 <br />0.00 <br />6300 <br />50.00 <br />5113.40 <br />11 <br />2575604 <br />SEEDING <br />SY <br />225.00 <br />51.80 <br />SCHEDULE 7.0- VALENTO LANE -TOTAL 5377,00 540.291.74 <br />i19 4 <br />N0. <br />SPEC. <br />N0. <br />ITEM DESCRIPTION <br />BID SUMMARY <br />SCHEDULE I.0- DEMONT AVENUE TOTAL <br />SCHEDULE 2.0 DESOTO STREET -TOTAL <br />SCHEDULE 3,0 -COSTA LANE TOTAL <br />SCHEDULE 4.0- WESTWIND DRIVE -TOTAL <br />SCHEDULE 50 WINDROW DRIVE -TOTAL <br />SCHEDULE 5,0- CHANGE ORDER 41.TOTAL <br />SCHEDULE 7.0- VALENTO LANE -TOTAL <br />TOTAL BID SUMMARY 1H15 PERIOD <br />TOTAL BID SUMMARY TO DATE <br />UNI <br />ORIGINAL CONTRACT <br />QTY, UNIT PRICE <br />3 <br />THIS PERIOD <br />QTY. TOTAL 00909 QTY. TOTAL PRICE <br />THIS PERIOD <br />537343 <br />5375.70 <br />5377.00 <br />591640 <br />51,006,46 <br />50.00 <br />$377.00 <br />$3,425,96 <br />TOTAL TO DATE <br />AMOUNT EARNED <br />AMOUNT RETAINED <br />MATERIAL ON SITE <br />MATERIAL. DEDUCT. <br />PREVIOUS PAYMENTS <br />AMOUNT DUE <br />TOTAL THIS PERIOD <br />55425,99 <br />521,337.47 <br />50.00 <br />50.00 <br />524,763.46 <br />TOTAL TO DATE <br />5460,175.34 <br />5150000 <br />50,00 <br />50,00 <br />5433,011.06 <br />524.763.46 <br />TOTAL 70 DATE <br />5137,719,23 <br />560,13134 <br />545.051.62 <br />549,14044 <br />542,79594 <br />576.03004 <br />516101.74 <br />5460,175.34 <br />