My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
06-20-11 Council Agenda
>
City Council Packets
>
2010-2019
>
2011
>
06-20-11 Council Agenda
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/20/2011 8:19:10 AM
Creation date
6/20/2011 7:50:51 AM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
189
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
3. Connection to storm sewer to the south <br />This option would extend storm sewer south within the RR right -of -way to an <br />existing structure. The depth of the existing structure wilt allow for normal grade <br />on the storm sewer pipe and only green area should be disturbed during the <br />installation. A new RR permit would be necessary for the work, but no additional <br />easements would be needed. The estimated cost for this option is approximately <br />$12,500.00. <br />Summary <br />Due to the safety concerns related to the sinkhole's close proximity to the tracks; <br />immediate action should be taken to correct the issue. City crews will be filling the <br />sinkhole this Monday and will continue to monitor the area for additional sinking. <br />Based on a review of the options and associated costs we would recommend Option #3 <br />be completed along with abandonment of the existing storm sewer crossing. We are in <br />the process of applying for the necessary Railroad permits and would like to complete <br />the new pipe installation and old pipe abandonment as soon as possible. The estimated <br />cost of the work is small enough to allow obtaining quotes for the work instead of a <br />formal bidding process and we would like City Council authorization to complete the <br />installation of the pipe and abandonment of the existing pipe. The estimated <br />construction cost for this work is $15,500, but we would like Council authorization for <br />construction costs up to $20,000 to address any unforeseen conditions. <br />If you have any questions please call me at (763) 780 -0450 extension 3. <br />10082 Flanders Court NE — Blaine, MN 55449 — Ph: (763) 780 -0450 Fax (763) 780-0452 <br />Memo - 081711 -CC (Jackson RR Stomi x -mg) <br />2 <br />
The URL can be used to link to this page
Your browser does not support the video tag.