Laserfiche WebLink
ENGINEER'S ESTIMATE <br />PROJECT: SANITARY LINING <br />OWNER: CITY OF LITTLE CANADA <br />SUMMARY OF WORK ITEMS 8.1. INTERCEPTOR REPAIRS AND 8,2. MANHOLE REPAIR <br />ITEM <br />NO. <br />ITEM DESCRIPTION <br />UNIT TOTAL <br />TOTAL PRICE COST <br />UNIT QTY ($) ($) <br />1 SETUP PER REACH 18 $1,000.00 $18,000.00 <br />2 PRECLEAN 21" LINE PER REACH 11 $650.00 $7,150.00 <br />3 PRECLEAN 48" LINE PER REACH 7 $1,200.00 $8,400.00 <br />4 PROTRUDING TAP REMOVAL EACH 2 $900.00 $1,800.00 <br />5 SEAL 21" JOINTS EACH 37 $700.00 $25,900.00 <br />6 SEAL 48" JOINTS EACH 28 $950.00 $26.600.00 <br />7 RAISE MH (1 foot, new rings & casting) EACH 9 $1,500.00 $13,500.00 <br />8 NEW CASTING EACH 5 $500.00 $2,500.00 <br />9 STRUCTURAL MH GROUTING PER MH 14 $1,500.00 $21,000.00 <br />10 POST CLEANING 21" LINE PER REACN 8 $650.00 $5,200.00 <br />11 POST CLEANING 46" LINE PER REACH 27 $1,200.00 $32,400.00 <br />12 SPOT REPAIR EACH 1 $20,000.00 $20,000.00 <br />13 BYPASS PUMPING LS 1 $40,000.00 $40,000.00 <br />Subtotal $222,450.00 <br />20 % Contingency $44,490.00 <br />Construction Total $266,940.00 <br />SUMMARY OF WORK ITEM C, 1- LC-421 SLIP LINING, ABANDONING, & REROUTING <br />UNIT TOTAL <br />ITEM TOTAL PRICE COST <br />NO. ITEM DESCRIPTION UNIT QTY (3) (3) <br />1 MOBILIZATION 1 DEMOBILIZATION LS 1 $10,000.00 $10,000.00 <br />2 48" PIPE ABANDONMENT LS 1 $18,000.00 $18,000.00 <br />3 12" PIPE IN 48" PIPE LS 1 $180,000.00 $180,000.00 <br />4 12" PIPE REROUTE LS 1 $40,000.00 340,000.00 <br />5 INSTALL NEW MN EA 3 $20,000.00 $60,000.00 <br />6 BYPASS PUMPING LS 1 $40,000.00 $40,000.00 <br />Subtotal $348,000.00 <br />20% Contingency $69,600.00 <br />Construction Total $417,600.00 <br />ESTIMATED TOTAL CONSTRUCTION COSTS <br />ESTIMATED ENGINEERING COSTS (7 %) <br />TOTAL DESIGN & CONSTRUCTION COSTS <br />ADMIN COSTS (15% CONSTRUCTION COSTS) <br />TOTAL ESTIMATED PROJECT COSTS <br />22 <br />$684,540.00 <br />$47,917.80 <br />$732,457.80 <br />$102,681.00 <br />$835,138.80 <br />