Laserfiche WebLink
ITEM <br />N0. <br />- <br />ITEM DESCRIPTION <br />UNIT <br />ORIGINAL CONTRACT <br />QTY, UNIT PRICE <br />THISP RIOD <br />OW, TOTAL PRICE <br />TOTAL TO DATE <br />QTY. TOTAL PRICE <br />0.00 <br />5000 <br />0.00 <br />5000 <br />2 <br />4 <br />REMOVE CONCRETE SIDEWALK <br />SY <br />10,00 <br />812.00 <br />000 <br />50.00 <br />1500 <br />518000 <br />5 <br />REMOVE BITUMINOUS PAVEMENT <br />SY <br />600.00 <br />5175 <br />0.00 <br />50.00 <br />622.00 <br />51,088.50 <br />6 <br />COMMON EXCAVATION (P) <br />CY <br />CY <br />600.00 <br />90,00 <br />516.00 <br />53025 <br />0.00 <br />0.00 <br />50.00 <br />50.00 <br />600.00 <br />0.00 <br />59,600.00 <br />50.00 <br />7 <br />TOPSOIL BORROW <br />0 <br />GEOTEXTILE FABRIC <br />SY <br />1055.00 <br />51,35 <br />0.00 <br />50.00 <br />1,654.0 <br />52,232.00 <br />9 <br />AGGREGATE DASE CLASS 5 <br />TON <br />980.00 <br />514.80 <br />0.00 <br />50.00 <br />69387 <br />513,229.28 <br />10 <br />TYPE MV4 WEAR COURSE MIXTURE <br />TON <br />17000 <br />577.00 <br />0.00 <br />50.00 <br />211.07 <br />516,252,39 <br />11 <br />4" PERF PE PIPE DRAIN WISOCI( <br />LF <br />125.00 <br />5800 <br />000 <br />50.00 <br />167.00 <br />51,336,00 <br />12 <br />10" (DUAL WALL) 11180E STORM SEWER <br />LF <br />37000 <br />517.30 <br />0.00 <br />50.00 <br />374.00 <br />56,470.20 <br />13 <br />CONNECT TO EXISTING STORM STRUCTURE <br />EACH <br />100 <br />$34500 <br />000 <br />50.00 <br />1.00 <br />5345.00 <br />14 <br />CONST DRAINAGE STRUCTURE DESIGN SPECIAL (27" DIA) <br />EACH <br />3.00 <br />53.315.00 <br />0.00 <br />50.00 <br />300 <br />59.945.00 <br />15 <br />CONST DRAINAGE STRUCTURE DESIGN 404020 <br />EACH <br />1.00 <br />59,150.00 <br />0.00 <br />50,00 <br />1.00 <br />54,150.00 <br />16 <br />4' CONCRETE SIDEWALK <br />SF <br />70.00 <br />50,25 <br />0.00 <br />50.00 <br />0.00 <br />50.0D <br />17 <br />BASKETBALL HOOP <br />LS <br />1,00 <br />53,45000 <br />1.00 <br />53.450.00 <br />100 <br />53,450.00 <br />10 <br />SPORT COURT MARKING <br />LS <br />1,00 <br />54.850.00 <br />0.00 <br />50.00 <br />0.00 <br />50,00 <br />19 <br />INLET PROTECTION (WIMC0) <br />EACH <br />3.00 <br />6215.00 <br />000 <br />50.00 <br />3.00 <br />5645.00 <br />20 <br />EROSION CONTROL BLANKET, CATEGORY 2 <br />SY <br />110,00 <br />54.40 <br />0.00 <br />50.00 <br />0.00 <br />50.00 <br />21 <br />SEEDING TYPE 2702 <br />SY <br />1,150.00 <br />53.45 <br />0.00 <br />5000 <br />0.00 <br />5000 <br />SCHEDULE. 6.0- THUNDERBAY PARK - TOTAL 53460,00 573,414.27 <br />SCHEDULE 4,0 - ALTERNATE COMPLETION DATE <br />1 <br />SCHEDULE IO COMPLETION EXTENSION <br />LS <br />1.00 <br />5250.00 <br />0.00 <br />5000 <br />0.00 <br />5000 <br />2 <br />SCHEDULE 2.0 COMPLETION EXTENSION <br />LS <br />1.00 <br />5150.00 <br />0.00 <br />50,00 <br />0.00 <br />60.00 <br />3 <br />SCHEDULE 3,0 COMPLETION EXTEN$ION <br />LS <br />1.00 <br />5900.00 <br />0,00 <br />50.00 <br />000 <br />50.00 <br />4 <br />SCHEDULE 4.0 COMPLETION EXTENSION <br />LS <br />10D <br />574000 <br />0.00 <br />50.00 <br />000 <br />50.00 <br />5 <br />SCHEDULE 5.0 COMPLETION EXTENSION <br />LS <br />1.00 <br />5825.00 <br />000 <br />50.00 <br />0.00 <br />50.00 <br />SCHEDULE 6.0- ALTERNATE COMPLETION DATE - TOTAL 50.00 50.00 <br />BID SUMMARY, <br />SCHEDULE 1.0 - WATERWORKS TRAIL - TOTAL <br />SCHEDULE 2.0- SPOONER PARK - TOTAL <br />SCHEDULE 3.0- VALENTO LANE - TOTAL <br />SCHEDULE 4.0- PIONEER PARK -TOTAL <br />SCHEDULE 5.0- THUNDERBAY PARK -TOTAL <br />SCHEDULE 0.0 - ALTERNATE COMPLETION DATE • TOTAL <br />TOTAL 81D SUMMARY THIS PERIOD <br />TOTAL BID SUMMARY TO DATE <br />THIS PERIOD <br />50.00 <br />50.00 <br />50.00 <br />50.00 <br />53,460.00 <br />50.00 <br />53,450.00 <br />TOTAL TO DATE <br />513,659.02 <br />50.00 <br />56,545.44 <br />657,593,21 <br />573,414.27 <br />$0.00 <br />5151,612,83 <br />3 <br />TOTAL THIS PERIOD <br />TOTAL TO DATE _. <br />AMOUNT EARNED <br />53.450.00 <br />6151,612.03 <br />AMOUNT RETAINED <br />5172.50 <br />57,580.64 <br />MATERIAL ON SITE <br />50.00 <br />50,0D <br />MATERIAL DEDUCT. <br />50.00 <br />50.00 <br />PREVIOUS PAYMENTS <br />5140,764,69 <br />AMOUNT DUE <br />53,27750 <br />53,277,50 <br />3 <br />