My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
08-24-11 Council Agenda
>
City Council Packets
>
2010-2019
>
2011
>
08-24-11 Council Agenda
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/9/2014 1:43:25 PM
Creation date
8/22/2011 7:57:29 AM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
137
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
STEP 8: Contribution to Stormwater Impact Fund <br />► For the remaining volume reduction needed, the applicant shall pay into a stonnwater impact fund that will be used <br />by the District to complete volume reduction projects. The contribution amount is $40,000 per acre of impervious <br />surfaces on a project site. At this contribution amount, the rate per cubic foot is $12.25. Use the formula below to <br />calculate the amount needed to contribute. <br />box (e)I Ix $12.25 = <br />Remaining Volume Required (13) <br />Amount to Contribute to Stormwater Impact Fund <br />STEP 9: Summary /Verification Step <br />►Complete Step 9 by filling in the blanks below as applicable. Verify that the volume reduction provided is equal to <br />or greater than the required volume reduction amount. <br />Verify Step 3 box (d) + Step 8 box (e) are equal to or greater than Step 2 box (c). <br />1 <br />1093911 <br />box (d) <br />Provided Volume Reduction (cu.ft.) (box (d) + box (e)) <br />Required Volume Reduction (cu. ft.) (box (c)) <br />Have you met the volume reduction standard? <br />41 <br />
The URL can be used to link to this page
Your browser does not support the video tag.