Laserfiche WebLink
Moore's Evergreen Hill <br />Development Contract <br />Prevention Plan (SWPPP) and to the City Engineer's satisfaction. The Developer shall prepare <br />an as -built survey verify elevations of each structure constructed as each parcel is developed. <br />Should Developer sell any lots to a third party prior to the construction of a principle dwelling <br />unit on any lot within the Development, then Developer shall require the third party to assume <br />these same responsibilities as a condition of the purchase agreement. The developer shall also <br />include an additional provision in the third party purchase agreement that indicates the third <br />party's understanding that should they fail to comply with any of the provisions delineated in this <br />section, the third party understands that the City will withhold the certificate of occupancy until <br />these provision are fully complied with and that the third party is subject to any fines and <br />penalties that said violations may generate. <br />19. The Developer shall install Plat monuments prior to the issuance of any building <br />permits within the Plat. Said monuments shall be installed and certified by a registered land <br />surveyor. Monument locations must thereafter he verified prior to the issuance of any <br />Certificates of Occupancy for houses constructed within the development. <br />20. Developer shall instruct his engineer to provide adequate field inspection personnel <br />to ensure the project is constructed in accordance with approved plans and specifications. In <br />addition, the City's Engineer, at Developer's expense, shall also inspect the construction of <br />Required Improvements for the purpose of certifying the same and recommending acceptance by <br />City. Developer shall also complete construction staking for the project at Developer's expense. <br />Required Improvements <br />21. The Required Improvements include: public streets to serve the Plat; the <br />construction of water main and services; the extension of sanitary sewer main and services; <br />storm sewer and ponding; grading; establishment of vegetation, paving; concrete curb and gutter; <br />signage; and, street lighting. Any lighting which may become an ongoing City expense shall he <br />coordinated with the City and Xcel Energy to minimize future operational costs with Developer <br />to bear system installation costs to allow City to attain Xcel Energy's "Customer Owned Group <br />V" rate. All such Required Improvements, except the final lift of blacktop on the road, shall be <br />_6- <br />7 <br />