Laserfiche WebLink
I� RING k JIMMIES <br />NAU[ NOAMII <br />Memo <br />TO: Mayor Blesener & Members of the City Council <br />FROM: Lee Elfering, City Engineer <br />DATE: March 20, 2008 <br />RE: SW Trunk Watermain Project <br />Approval of Plans & Authorization for Advertising <br />As the City Council is aware, the construction of the new St. Jude facility off of County <br />Road B2 requires that the City install a trunk watermain loop into the area to provide <br />sufficient fire protection to the building. In addition to providing adequate fire protection <br />of the new St, Jude facility, the trunk watermain will increase fire protection for the <br />businesses along Minnesota Avenue and townhouses within Cobblestone Village along <br />with other areas within the existing water system. Plans and specifications have been <br />prepared for the following improvements: <br />• Installation of a 12" watermain loop from the railroad tracks west along County <br />Road B2, then south through the St. Jude site, and back east along Viking Drive <br />to the railroad tracks. This watermain will also tie into the watermain in <br />Stephanie Court in the Cobblestone Village Townhome Association. <br />• Repair of the sanitary sewer service at 2930 Edgerton Street. <br />The plans are currently being reviewed by the Ramsey Washington Metro Watershed <br />Office for approval and we do not anticipate significant comments. At this time we are <br />requesting plan approval and authorization for advertisement for bids from the City <br />Council. If you have any questions please call me at (763) 780 -0450 extension 13, <br />10062 Randers Court NE — Blaine, MN 55449 — Ph: (763) 780 -0450 - Fax (763) 780 -0452 <br />C: \Documents and Settings \kathy.glanzer \Local Settings \Temporary Internet Files\0LK2D \Memo - 032008 - council (authorize bids).doc <br />