|
ITEM
<br />NO.
<br />SPEC
<br />REF. ITEM
<br />DESCRIPTION
<br />UNIT
<br />ORIGINAL CONTRACT
<br />QTY. UND PRICE
<br />TOTAL PROJECT
<br />QTY. TOTAL PRICE
<br />REALIGNMENT SECTION
<br />QTY. TOTAL PRICE
<br />52
<br />2504.602
<br />ABANDON WATER SERVICE
<br />EACH
<br />2.00
<br />$328.88
<br />3.00
<br />5986.64
<br />3.00
<br />$986.64
<br />53
<br />2504.602 INSTALL
<br />HYDRANT
<br />EACH
<br />2.00
<br />52,344.96
<br />1.00
<br />$2,344.96
<br />0.00
<br />$0.00
<br />54
<br />2504.602 INSTALL
<br />HYDRANT AND VALVE
<br />EACH
<br />1.00
<br />$3,124.40
<br />4.00
<br />$12,497.60
<br />1.00
<br />$3,124.40
<br />55
<br />2504.602
<br />ADJUST HYDRANT
<br />EACH
<br />1.00
<br />$594.12
<br />1.00
<br />5594.12
<br />0.00
<br />$0.00
<br />56
<br />2504.602
<br />WATERMAIN OFFSET
<br />EACH
<br />2.00
<br />52,712.18
<br />1.00
<br />52.712.18
<br />0.00
<br />$0.00
<br />57
<br />2504.602
<br />8 "X4" WET TAP
<br />EACH
<br />1.00
<br />$1,798.48
<br />1.00
<br />$1,798.48
<br />0.00
<br />$0.00
<br />58
<br />2504.602
<br />8 "X6" WET TAP
<br />EACH
<br />2.00
<br />$1,850.76
<br />1.00
<br />31,850.76
<br />1.00
<br />$1,850.76
<br />59
<br />2504.602
<br />ADJUST VALVE 80X
<br />EACH
<br />5.00
<br />3120.00
<br />8.00
<br />5960.00
<br />2.00
<br />5240.00
<br />60
<br />2504.602
<br />VALVE BOX EXTENSION
<br />EACH
<br />1.00
<br />$129.06
<br />0.00
<br />50.00
<br />1.00
<br />3129.08
<br />61
<br />2504.602
<br />WATERMAIN SERVICE CONNECTION
<br />EACH
<br />2.00
<br />$248.32
<br />4.00
<br />$993.28
<br />0.00
<br />$0.00
<br />62
<br />2504.603
<br />1" TYPE K COPPER PIPE
<br />LF
<br />76.00
<br />520.27
<br />120.00
<br />52,432.40
<br />0.00
<br />$0.00
<br />63
<br />2504.603
<br />4" DUCTILE IRON WATERMAIN CL 52
<br />LF
<br />22.00
<br />$24.51
<br />20.00
<br />$490.20
<br />0.00
<br />$0.00
<br />64
<br />2504.603
<br />LOWER WATERMAIN
<br />LF
<br />300.00
<br />$27.24
<br />320.00
<br />$8,716.80
<br />320.00
<br />$8,716.80
<br />65
<br />2504.604
<br />4" WATERMAIN INSULATION
<br />SY
<br />175.00
<br />$16.00
<br />180.60
<br />52.889.60
<br />180.60
<br />$2,889.60
<br />66
<br />2506.502
<br />CONST DRAINAGE STRUCTURE DESIGN SPECIAL 24 5(36"
<br />EACH
<br />16.00
<br />$1,319.33
<br />15.00
<br />$19,789.95
<br />2.00
<br />$2,638.66
<br />67
<br />2506.502
<br />CONST DRAINAGE STRUCTURE DESIGN 27 .4020
<br />EACH
<br />2.00
<br />$1,040.96
<br />2.00
<br />32,081.92
<br />0.00
<br />$0.00
<br />68
<br />2506.502
<br />CONST DRAINAGE STRUCTURE DESIGN 48 -4020
<br />EACH
<br />23.00
<br />51,469.76
<br />25.00
<br />$36,744.00
<br />7.00
<br />510,288.32
<br />69
<br />2506.502
<br />CONS DRAINAGE STRUCTURE DESIGN 54 -4020
<br />EACH
<br />1.00
<br />$1,617.44
<br />1.00
<br />$1,617.44
<br />0.00
<br />$0.00
<br />70
<br />2506.503
<br />RECONSTRUCT DRAINAGE STRUCTURE
<br />EACH
<br />2.00
<br />$835.93
<br />1.00
<br />$835.93
<br />0.00
<br />50.00
<br />71
<br />2506.522
<br />ADJUST FRAME AND RING CASTING
<br />EACH
<br />4.00
<br />5400.00
<br />6.00
<br />32,400.00
<br />0.00
<br />$0.00
<br />72
<br />2506.602
<br />CONSTRUCT SANITARY MANHOLE
<br />EACH
<br />3.00
<br />51,932.97
<br />3.00
<br />$5,798.91
<br />0.00
<br />$0.00
<br />73
<br />2511.502
<br />RANDOM RIP RAP CLASS IV
<br />TON
<br />37.00
<br />$84.46
<br />43.85
<br />$3,703.57
<br />0.00
<br />$0.00
<br />74
<br />2521.501
<br />CONCRETE PAD (6 °THICK)
<br />SF
<br />16.00
<br />$6.18
<br />0.00
<br />$0.00
<br />0.00
<br />$0.00
<br />75
<br />2531.501
<br />CONCRETE CURB &GUTTER DESIGN 8618
<br />LF
<br />8,997.00
<br />$8.45
<br />8918.00
<br />875,357.10
<br />1,666.00
<br />$14,077.70
<br />76
<br />2531.501
<br />CONCRETE CURB & GUTTER DESIGN 8624
<br />LF
<br />175.00
<br />$10.30
<br />195,00
<br />$2,008.50
<br />195.00
<br />$2,008.50
<br />77
<br />2531.502
<br />CONCRETE CURB & GUTTER SPECIAL
<br />LF
<br />181.00
<br />$10.82
<br />181.00
<br />51,958.42
<br />0.00
<br />$0.00
<br />78
<br />2531.507
<br />CONCRETE DRIVEWAY APRON (6" THICK)
<br />SY
<br />80.00
<br />537.34
<br />194.00
<br />$7,243.96
<br />0.00
<br />$0.00
<br />79
<br />2531.507
<br />CONCRETE DRIVEWAY APRON (8 "THICK)
<br />SY
<br />42.00
<br />544.29
<br />11.80
<br />$522.62
<br />0.00
<br />$0.00
<br />80
<br />2531.507
<br />CONCRETE DRIVEWAY PAVEMENT (8 " THICK)
<br />5Y
<br />15.00
<br />$44.29
<br />0.00
<br />$0.00
<br />0.00
<br />$0.00
<br />81
<br />2531.604
<br />CONCRETE VALLEY GUTTER (8 "THICK)
<br />SY
<br />15.00
<br />$47.38
<br />18.00
<br />$852.84
<br />0.00
<br />$0.00
<br />82
<br />2531.602
<br />CONCRETE PEDESTRIAN RAMP
<br />EACH
<br />1.00
<br />$628.30
<br />1.00
<br />5628.30
<br />0.00
<br />$0.00
<br />83
<br />2540.602
<br />INSTALL SALVAGED MAILBOX
<br />EACH
<br />14.00
<br />$61.80
<br />8.00
<br />$494.40
<br />0.00
<br />$0.00
<br />84
<br />2540.603
<br />LANDSCAPE EDGER
<br />LF
<br />1,065.00
<br />$6.18
<br />982.00
<br />$6,068.76
<br />0,00
<br />$0.00
<br />85
<br />2540.618
<br />INSTALL STONE RETAINING WALL
<br />SF
<br />340.00
<br />530.90
<br />618.00
<br />819,096.20
<br />0.00
<br />$0.00
<br />86
<br />2557.603
<br />INSTALL CHAIN LINK FENCE
<br />LF
<br />1.175.00
<br />$4.12
<br />1168.00
<br />$4.812.16
<br />0.00
<br />$0.00
<br />87
<br />2563,601
<br />TRAFFIC CONTROL
<br />LS
<br />1.00
<br />81,54500
<br />1.00
<br />81.545.00
<br />0.21
<br />5324.45
<br />88
<br />2563.601
<br />DETOUR SIGNING
<br />LS
<br />1.00
<br />$1,030.00
<br />1.00
<br />$1,030.00
<br />1.00
<br />51,030.00
<br />89
<br />2564.531
<br />F & I SIGN PANEL
<br />SF
<br />356.25
<br />512.36
<br />320.50
<br />53,961.38
<br />49.50
<br />$611.82
<br />90
<br />2564.602
<br />F & I SIGN POST
<br />EACH
<br />55.00
<br />572.10
<br />66.00
<br />$4,758.60
<br />9.00
<br />5648.90
<br />91
<br />2564.602
<br />INSTALL SALVAGED SIGN
<br />EACH
<br />10.00
<br />561.80
<br />7.00
<br />$432.60
<br />0.00
<br />$0,00
<br />92
<br />2564.603
<br />4" SOLID LINE WHITE - PAINT
<br />LF
<br />12,690.00
<br />$0.08
<br />12525.00
<br />$1,002.00
<br />1,600.00
<br />$128.00
<br />93
<br />2564.603
<br />4" SOLID LINE WHITE - EPDXY
<br />LF
<br />12,690.00
<br />$0.23
<br />0.00
<br />50.00
<br />1,600.00
<br />$368.00
<br />94
<br />2564.603
<br />4" DOUBLE SOLID LINE YELLOW - PAINT
<br />LF
<br />6,344.00
<br />$026
<br />6147.00
<br />51,598.22
<br />800.00
<br />5208.00
<br />95
<br />2564.603
<br />4" DOUBLE SOLID LINE YELLOW - EPDXY
<br />LF
<br />6,344.00
<br />50.44
<br />0.00
<br />$0.00
<br />800.00
<br />$352.00
<br />96
<br />2564.603
<br />24' STOP LINE, WHITE - EPDXY
<br />LF
<br />16.00
<br />$13.20
<br />0.00
<br />$0.00
<br />0.00
<br />$0.00
<br />97
<br />2572.501
<br />TEMPORARY CONSTRUCTION FENCE
<br />LF
<br />1,025.00
<br />$1.38
<br />178.00
<br />$245.64
<br />0.00
<br />$0.00
<br />98
<br />2573,502
<br />SILT FENCE TYPE MACHINE SLICED
<br />LF
<br />4,939.00
<br />52.06
<br />6342.00
<br />$13,064.52
<br />800.00
<br />51,648.00
<br />99
<br />2573.520
<br />SEDIMENT REMOVAL BACKHOE
<br />HR
<br />18.00
<br />$97.85
<br />0.00
<br />$0.00
<br />0.00
<br />$0.00
<br />100
<br />2573.530
<br />INLET PROTECTION (WIMCO)
<br />EACH
<br />49.00
<br />$175.10
<br />42.00
<br />$7,354.20
<br />0.00
<br />$0.00
<br />101
<br />2573.530
<br />INLET PROTECTION (STRUCTURE W/O CASTING)
<br />EACH
<br />49.00
<br />$175.10
<br />36.00
<br />$6,303.60
<br />7,00
<br />$1,225.70
<br />102
<br />2573.602
<br />INLET SEDIMENT REMOVAL
<br />EACH
<br />90.00
<br />5103.00
<br />59.00
<br />56,077.00
<br />10,00
<br />$1,030.00
<br />103
<br />2573.607
<br />ROADWAY ROCK CHECK DAM
<br />CY
<br />70.00
<br />$33.99
<br />76.60
<br />$2,603.63
<br />16.00
<br />5543.84
<br />104
<br />2575.513
<br />MULCH MATERIAL TYPE SPECIAL
<br />CY
<br />75.00
<br />$26.06
<br />56.00
<br />51,459.36
<br />0.00
<br />$0.00
<br />105
<br />2575.532
<br />EROSION CONTROL BLANKET, CATEGORY 1 (VIKING)
<br />SY
<br />815.00
<br />52.06
<br />306.00
<br />$630.36
<br />0.00
<br />$0.00
<br />106
<br />2575.532
<br />EROSION CONTROL BLANKET, CATEGORY 1 (BOSS ROAD)
<br />SY
<br />800.00
<br />$2.06
<br />1310,00
<br />82,698.60
<br />0.00
<br />$0.00
<br />107
<br />2575.550
<br />COMPOST GRADE 2
<br />SY
<br />5,600.00
<br />52.16
<br />538.80
<br />51,163.81
<br />0.00
<br />$0.00
<br />SCHEDULE 1.0 -TOTAL $1,023,511.26 5215,974.7811
<br />
|