Laserfiche WebLink
ITEM <br />NO. <br />SPEC <br />REP. ITEM <br />DESCRIPTION <br />UNIT <br />ORIGINAL CONTRACT <br />QTY. UNIT PRICE <br />THIS PER 0D <br />QTY. TOTAL PRICE <br />TOTAL TO DATE <br />QTY. TOTAL PRICE <br />47 <br />2503602 <br />OFFSET STORM SEWER FORCEMAIN <br />EACH <br />2.00 <br />52,600 82 <br />0.00 <br />30.00 <br />3.00 <br />57,00245 <br />48 <br />2503.602 <br />6 "X4" PVC WYE <br />EACH <br />2.00 <br />546.63 <br />0.00 <br />50.00 <br />2.00 <br />593,26 <br />49 <br />2503.603 <br />CONSTRUCT S" INSIDE DROP <br />LF <br />6,00 <br />5117.18 <br />0.00 <br />5000 <br />6.00 <br />5702.96 <br />50 <br />2503,603 <br />8" PVC PIPE SEWER SOR 35 <br />LF <br />334.00 <br />520.87 <br />0.00 <br />50.00 <br />334.00 <br />56970.56 <br />51 <br />2503.603 <br />4" PVC SERVICE PIPE SCR 40 <br />LF <br />62,00 <br />513.12 <br />0.00 <br />3000 <br />91.00 <br />51,193.92 <br />52 <br />2504.602 <br />ABANDON WATER SERVICE <br />EACH <br />2.00 <br />5328,88 <br />0.00 <br />5000 <br />3.00 <br />5966.64 <br />53 <br />2504,602 <br />INSTALL HYDRANT <br />EACH <br />2.00 <br />52.34496 <br />000 <br />5000 <br />1.00 <br />52,344.96 <br />54 <br />2504.602 <br />INSTALL HYDRANT VALVE <br />EACH <br />1.00 <br />53,124.40 <br />0.00 <br />$000 <br />400 <br />512,497.60 <br />55 <br />2504.602 <br />ADJUST HYDRANT <br />EACH <br />1.00 <br />3594.12 <br />0.00 <br />50.00 <br />1,00 <br />5594.12 <br />56 <br />2504.602 <br />WATERMAIN OFFSET <br />EACH <br />2.00 <br />52.712.18 <br />000 <br />NOD <br />100 <br />52712.18 <br />57 <br />2504,602 <br />8 "X4 "WET TAP <br />EACH <br />1.00 <br />51,798.48 <br />0.00 <br />50.00 <br />1.00 <br />$1.790.40 <br />58 <br />2504.602 <br />8" X 6" WET TAP <br />EACH <br />2.00 <br />51,850.76 <br />0,00 <br />5000 <br />1.00 <br />51.850.76 <br />59 <br />2504.602 <br />ADJUST VALVE. BOX <br />EACH <br />5.00 <br />5120.00 <br />3.00 <br />5360.00 <br />11,00 <br />81,32000 <br />60 <br />2504.602 <br />VALVE 80X EXTENSION <br />EACH <br />1,00 <br />5129.06 <br />100 <br />5129.06 <br />1.00 <br />5129.06 <br />61 <br />2504.602 <br />WATERMAN SERVICE CONNECTION <br />EACH <br />2.00 <br />5248.32 <br />0.00 <br />50.00 <br />4.00 <br />5993,28 <br />62 <br />2504.603 <br />1 " TYPE K COPPER PIPE <br />11, <br />76.00 <br />520.27 <br />0,00 <br />50.00 <br />120.00 <br />52.432.40 <br />63 <br />2504.603 <br />4" DUCTILE IRON WATERMAIN Cl 52 <br />LP <br />22.00 <br />524.51 <br />O,00 <br />80.00 <br />20.00 <br />5490.20 <br />64 <br />2504.603 <br />LOWER WATERMAIN <br />LF <br />300.00 <br />527.24 <br />0.00 <br />80.00 <br />320.00 <br />58716.80 <br />65 <br />2504.604 <br />4" WATERMAIN INSULATION <br />SY <br />175.00 <br />516.00 <br />0.00 <br />50.00 <br />180.60 <br />52,889.60 <br />66 <br />2506.502 <br />CONST DRAINAGE STRUCTURE DESIGN SPECIAL 24 "X36" <br />EACH <br />56.00 <br />51 319.33 <br />0.00 <br />$0.00 <br />15.00 <br />$19,789.95 <br />67 <br />2506.502 <br />CONST DRAINAGE STRUCTURE DESIGN 274020 <br />EACH <br />2.00 <br />$1.040,96 <br />0.00 <br />$000 <br />2,00 <br />82.081.92 <br />68 <br />2506.502 <br />CONST DRAINAGE STRUCTURE DESIGN 48 .4020 <br />EACH <br />23.00 <br />51 469 .76 <br />0.00 <br />$0.00 <br />25.00 <br />$36.744.00 <br />69 <br />2506.502 <br />CONS DRAINAGE STRUCTURE DESIGN 544020 <br />EACH <br />1.00 <br />$1,61744 <br />000 <br />$000 <br />1.00 <br />$1,617.44 <br />70 <br />2506.503 <br />RECONSTRUCT DRAINAGE STRUCTURE <br />EACH <br />2,00 <br />583593 <br />0.00 <br />$0.00 <br />1.00 <br />5035.93 <br />71 <br />2506.522 <br />ADJUST FRAME AND RING CASTING <br />EACH <br />4.00 <br />8400.00 <br />4.00 <br />51,600.00 <br />10,00 <br />$4,00000 <br />72 <br />2506.602 <br />CONSTRUCT SANITARY MANHOLE <br />EACH <br />3.00 <br />$1,93297 <br />000 <br />$000 <br />3.00 <br />55798.01 <br />73 <br />2611.602 <br />RANDOM RIP RAP CLASS IV <br />TON <br />37.00 <br />$04.46 <br />0.00 <br />80.00 <br />43.85 <br />33,703.57 <br />74 <br />2521,501 <br />CONCRETE PAO(6 "THICK) <br />SF <br />16.00 <br />56.18 <br />0.00 <br />50.00 <br />0.00 <br />$0.00 <br />75 <br />2531.501 <br />CONCRETE CURB & GUTTER DESIGN 8618 <br />LF <br />8.99] 00 <br />58.45 <br />000 <br />$0.00 <br />8.910.00 <br />575,357.10 <br />76 <br />2531.501 <br />CONCRETE. CURB & GUTTER DESIGN 8624 <br />LF <br />175.00 <br />510.30 <br />0.00 <br />$0,00 <br />195.00 <br />$2008.50 <br />77 <br />2531.502 <br />CONCRETE CURB& GUTTER SPECIAL <br />LF <br />181.00 <br />$10,82 <br />0.00 <br />80.00 <br />181,00 <br />51.958.42 <br />78 <br />2531.507 <br />CONCRETE DRIVEWAY APRON (6" THICK) <br />SY <br />SY <br />80.00 <br />42.00 <br />$37.34 <br />0.00 <br />3000 <br />19400 <br />57,243.96 <br />79 <br />2531.507 <br />CONCRETE DRIVEWAY APRON 18" 711I0K) <br />54429 <br />0.00 <br />80.00 <br />11.80 <br />$522.62 <br />80 <br />2531507 <br />2531.604 <br />CONCRETE DRIVEWAY PAVEMENT(8THICK) <br />CONCRETE VALLEY GUTTER (6" THICK) <br />SY <br />5Y <br />1500 .,_ <br />15.00 <br />544.29 <br />0.00 <br />$0.00 <br />0.00 <br />5000 <br />81 <br />847.38 <br />000 <br />$0.00 <br />18.00 <br />$852.04 <br />02 <br />2531.602 <br />CONCRETE PEDESTRIAN RAMP <br />EACH <br />1.00 <br />5626.30 <br />0.00 <br />60.00 <br />1.00 <br />6628.30 <br />83 <br />2640.602 <br />INSTALL SALVAGED MAILBOX <br />EACH <br />14,00 <br />561.80 <br />0.00 <br />5000 <br />8.00 <br />$494.40 <br />84 <br />2540.603 <br />LANDSCAPE EDGER <br />LE <br />1.065.00 <br />56,18 <br />0.00 <br />50.00 <br />982.00 <br />$6,06876 <br />85 <br />2540.618 <br />INSTALL S70NE RETAINING WALL <br />SF <br />340.00 <br />530.90 <br />0.00 <br />60.00 <br />618.00 <br />$19.096.20 <br />66 <br />2557.603 <br />INSTALL CHAIN LINK FENCE <br />LF <br />1,175,00 <br />84.12 <br />0.00 <br />50.00 <br />1168.00 <br />$4,612.16 <br />87 <br />2563,601 <br />TRAFFIC CONTROL <br />1.8 <br />1.00 <br />51,545.00 <br />0.00 <br />50.00 <br />1,00 <br />51545,00 <br />88 <br />2563,601 <br />DETOUR SIGNING <br />LS <br />1.00 <br />51.030.00 <br />0.00 <br />30.00 <br />1.00 <br />51.03000 <br />69 <br />2564.631 <br />F & 151011 PANEI. <br />SF <br />356.25 <br />512.36 <br />0.00 <br />80.00 <br />320.50 <br />53.961 38 <br />90 <br />2564602 <br />F & 1 SIGN POST <br />EACH <br />55.00 <br />$72.10 <br />0.00 <br />60.00 <br />66.00 <br />8475860 <br />91 <br />2564.602 <br />INSTALL SALVAGED SIGN <br />EACH <br />10.00 <br />561.80 <br />0.00 <br />50.00 <br />7.00 <br />5432.60 <br />92 <br />2564.603 <br />4" SOLID LINE WHITE - PAINT <br />LF <br />12,690.00 <br />80.08 <br />0.00 <br />50.00 <br />12,52500 <br />51002.00 <br />93 <br />2584.603 <br />4" SOLID LINE WHITE - EPDXY <br />LF <br />12.690.00 <br />50.23 <br />12446,00 <br />$2862.58 <br />12446.00 <br />52,862.58 <br />94 <br />2564.603 <br />4" DOUBLE SOLID LINE YELLOW • PAINT <br />LF <br />0344.00 <br />50.26 <br />0,00 <br />5000 <br />6.147.00 <br />$1,598,22 <br />95 <br />2564.603 <br />4" DOUBLE SOLID LINE YELLOW -EPDXY <br />LF <br />6,344,00 <br />5044 <br />5910.00 <br />$2600,40 <br />5,910.00 <br />52.60040 <br />96 <br />2564.603 <br />24" STOP LINE. WHITE- EPDXY <br />LP <br />16.00 <br />513.20 <br />04.00 <br />$1.240.80 <br />94,00 <br />$1.240,80 <br />97 <br />2572.501 <br />TEMPORARY CONSTRUCTION FENCE <br />LF <br />1,025.00 <br />51.38 <br />0.00 <br />$0.00 <br />178.00 <br />824564 <br />98 <br />2573.502 <br />SILT FENCE TYPE MACHINE SLICED <br />LF <br />4,939.00 <br />52.06 <br />0.00 <br />$0.00 <br />6.342.00 <br />$13,064.52 <br />99 <br />2573.520 <br />SEDIMENT REMOVAL BACKHOE <br />HR <br />18,00 <br />897.85 <br />0.00 <br />$0.00 <br />0.00 <br />$0.00 <br />100 <br />2573.530 <br />INLET PROTECTION (WMCO) <br />EACH <br />4900 <br />$175.10 <br />0.00 <br />50.00 <br />42.00 <br />87364.20 <br />101 <br />2573.530 <br />INLET PROTECTION (STRUCTURE W/0 CASTING) <br />EACH <br />49.00 <br />$175.10 <br />0,00 <br />$0.00 <br />36.00 <br />56,303,60 <br />102 <br />2573.602 <br />INLET SEDIMENT REMOVAL <br />EACH <br />90.00 <br />$10300 <br />0.00 <br />5000 <br />59.00 <br />$6.077,00 <br />103 <br />2573.607 <br />ROADWAY ROCK CHECK DAM <br />CY <br />70,00 <br />83399 <br />0.00 <br />$0.00 <br />76.60 <br />52,603.63 <br />3 <br />