My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
06-27-2007 Council Agenda
>
City Council Packets
>
2000-2009
>
2007
>
06-27-2007 Council Agenda
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/8/2011 10:34:45 AM
Creation date
11/8/2011 9:38:50 AM
Metadata
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
220
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
NORTHWEST ASSOCIATED CONSULTANTS, INC. <br />4800 Olson Memorial Highway, Suite 202, Golden Valley, MN 55422 <br />Telephone: 763.231 .2555 Facsimile: 763.231.2561 planners©nacplanning.com <br />MEMORANDUM <br />TO: Mayor Blesener and Little Canada City Council <br />FROM: Stephen Grittman <br />DATE: June 22, 2007 <br />RE: Little Canada — HOM Furniture Signage Request <br />FILE NO: 758.09 - 07.11 <br />HOM Furniture provided additional information relating to their signage request during <br />the period that they are remodeling, leasing, and opening the various retail uses in the <br />former Levitz building, as well as ongoing temporary signage for the site. The text of <br />there request is repeated below. Essentially, they have two categories of requests. <br />The first relates to signage that would be "interim" signage until permanent signs can be <br />erected once building remodeling is complete and tenant spaces are finalized. The <br />second category relates to temporary signage that they would like to have built into their <br />PUD request as ongoing temporary sign allowances for the site. <br />The below attachment of the 6 areas that HOM is proposing for the <br />opening of the former Levitz building as interim signage while we <br />do our remodeling. What we are requesting is that we will <br />restrict signs to these 5 areas identified on the building and <br />the existing pylon. We will be remodeling different areas of the <br />building and the signage will be moved within these areas <br />depending on where we are at in the remodeling process at any <br />given time. We propose to keep HOM's and any other tenant's <br />total interim signage at 60% or less of that allowed by City code <br />(15% of the East and North walls of the building) until the <br />construction process is over. HOM's intention is to open the <br />facility for a Clearance Center to generate business while <br />designing and remodeling the building. <br />The signs will all be of a good quality vinyl or wood and will <br />have a frame around them to give them a nice look. HOM is <br />proposing to have all secured to the building so no flapping can <br />be caused by the wind. Once HOM has the exterior and interior <br />drawings finalized and approved by the City of Little Canada, <br />construction will begin. As one area of construction is <br />completed, HOM will be forced to move it's product and signs to <br />that area to allow construction to continue in the none remodeled <br />area's. <br />
The URL can be used to link to this page
Your browser does not support the video tag.