My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
06-13-2007 Council Agenda
>
City Council Packets
>
2000-2009
>
2007
>
06-13-2007 Council Agenda
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/8/2011 11:36:17 AM
Creation date
11/8/2011 10:59:45 AM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
72
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
G. The permit requires each MS4 to implement a public education program to distribute educational materials to the <br />community or conduct equivalent outreach activities about the impacts of stormwater discharges on water bodies and <br />the steps that the public can take to reduce pollutants in stormwater runoff. [Part V.G.1.a] Please indicate which of <br />the following distribution methods you used. Indicate the number distributed in the spaces provided: <br />Number <br />Brochures 48 Utility bill inserts <br />Newsletter Radio ads <br />Posters 6 Television ads <br />Newspaper articles Other: <br />Web site* Other: <br />Number <br />*If you use your Web site as a tool to distribute stormwater educational materials, indicate the number of hits to the <br />stormwater page in the space above (if available) and provide the URL reference here: www.ci.little- canada.mn.us <br />H. At what stage of development do you believe your stormwater education program currently is in? (Check the one that <br />most accurately reflects the current status of your education program as a whole.) <br />❑ Not started <br />Research <br />® Development <br />Implementation <br />Program fully in place <br />I. Have you developed partnerships with other MS4s, watershed districts, local or state governments, <br />educational institutions, etc. to assist you in fulfilling the requirements for Minimum Control <br />Measure 1? If yes, list those entities with which you have an agreement and describe the nature of the <br />agreement(s): The Ramsey Washington Metro Watershed District is across the street from City Hall <br />and provides us with brochures and posters to put in our lobby. They also host many functions <br />which members of the public can attend. <br />® Yes in No <br />Minimum Control Measure 2: Public Participation /Involvement[V.G.2] <br />A. During your public meeting, did you receive written and /or oral input on your SWPPP? [Part <br />V.G.2.b.1 -3] Input must be considered prior to submittal of your annual report. <br />B. Did you create a record of comments and your response to comments /record of decision (ROD)? <br />C. Have you kept the ROD in accordance with the permit? [Part V.G.2.b] <br />D. Do you plan to incorporate any comments into your next SWPPP update? [Part V.G.2.c] If yes, list <br />items: <br />n Yes ❑ <br />❑ Yes ❑ <br />No <br />No <br />❑ Yes ❑ No <br />❑ Yes ❑ No <br />Minimum Control Measure 3: Illicit Discharge Detection and Elimination [V.G.3] <br />The permit requires each MS4 to develop, implement and enforce a program to detect and eliminate illicit discharges as <br />defined at 40 CFR 122.26(b)(2) into your SWPPP. You must also select and implement a program of appropriate BMPs <br />and measurable goals for this minimum control measure. <br />A. Have you completed the storm sewer system map in accordance with the requirements of the permit? <br />If no, by what date do you expect to have it completed? March 30, 2008 <br />The complete storm sewer system map must be finished by June 30, 2008. [Part V..G.3.a] <br />B. Has an ordinance or other regulatory mechanism been adopted to prohibit illicit discharges or other <br />non- stormwater discharges from entering your system? If yes, provide the date the regulatory <br />mechanism was adopted: . If no, provide an estimated date of adoption: August, 2007. <br />C. Have you developed a program for illicit discharge detection and elimination? <br />D. If yes, when do you expect that your program will be implemented? <br />E. If no, by what date do you expect to have a program developed? November 1 2007 <br />3 <br />Page 2 of 5 <br />wq -st m4 -06 <br />❑ Yes ®No <br />❑, Yes ®No <br />C Yes ®No <br />3/06 <br />
The URL can be used to link to this page
Your browser does not support the video tag.