Laserfiche WebLink
RJ <br />MARCO CONSTRUCTION, INC. <br />TO Little Canada City Hall <br />515 Little Canada Road East <br />Little Canada, MN 55117 <br />ATTN: Joel Hanson, City Manager <br />RE: Building Repair <br />South side of City Hall Building <br />2/20/2007 <br />Proposal for Repair Work <br />This proposal is for repairing the South wall of the city hall building because of a <br />vehicle crashing into it. All work is to be done during regular business hours (7am -4pm). <br />• Demolition $ 849.00 <br />Remove blinds at four windows, damaged wall insulation, damaged windows, <br />existing carpet & base in offices 2 & 3, damaged sheetrock as required, <br />plywood temporary wall, metal guard rail & hand rail. <br />• Lumber, sheetrock, hardiboard, material $ 1,121.00 <br />Lumber, sheetrock, hardiboard, caulk, window trim, plywood, screws, nails <br />• Carpentry Labor $ 3,867.00 - <br />Install 8 pella replacement window units, 2x4 wood stud wall framing at south <br />wall & interior walls, window trim, re- install batt insulation used for temporary wall, <br />poly vapor barrier on south wall, 3/4" treated plywood sheathing on south wall, <br />sheetrock repair & ceiling sheetrock patch compound, caulking <br />• Brick replacement $ 7,413.00 <br />Remove brick on half wall (approx. 37 LF), relay brick with the best possible <br />match 4' high x 31' long, and wing wall 8' -6" high x 5' long <br />NOTE: Due to the nature of the product, the new brick & grout will not match the <br />existing brick & grout, see alternate #1 for option to replace entire South wall with new <br />brick in order to attain a uniform and architecturally pleasing appearance to wall) <br />• Carpet & vinyl base $ 1,268.00 <br />Replace carpet and vinyl base in offices 2 & 3 to match existing <br />• Blinds $ 1,381.00 <br />(2) sets of vertical blinds to match existing, includes installation <br />• Pella Windows $ 2,214.00. <br />Pella Architect Series Casements (Qty 8 units) 2040 (matches existing) <br />• Painting & ceiling finish $ 3,374.00 <br />Finish ceilings in offices 2 & 3 <br />Paint ceilings in offices 2 & 3 <br />Paint walls in offices 1, 2, & 3 <br />Stain millwork & exterior trim to match existing <br />• Metal Guard Rail & Hand Rail $ 1,832.00 <br />Provide & install steel guard rail and steel hand rail to match existing <br />• HVAC $ 498.00 <br />Install 10 LF of metal floor diffuser to match existing <br />75 W. Viking Drive Suite 104 • Little Canada, Minnes: 3u0 :,117 = Phone (651) 484 -5635 = Fax (651) 484 -5701 <br />