My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
03-26-2007 Council Agenda
>
City Council Packets
>
2000-2009
>
2007
>
03-26-2007 Council Agenda
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/9/2011 10:44:19 AM
Creation date
11/9/2011 10:34:37 AM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
85
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
RJ MARCO CONSTRUCTION, INC. <br />TO: Little Canada City Hall <br />515 Little Canada Road East <br />Little Canada, MN 55117 <br />ATTN: Joel Hanson, City Manager <br />2/20/2007 <br />RE: Proposal for Additional Work <br />South side of City Hall Building <br />Proposal for Alternates <br />This proposal is for additional work requested by the city of Little Canada. This proposal is <br />valid only if RJ Marco performs the repair work quoted in proposal dated 2/20/07. <br />Alternate #3 add $ 5,852.00 <br />• Brick halfwall at exterior stairway in lieu of steel guard rail <br />Lay brick on poured wall at stairway, double width wall 40" high, 12" wide, <br />16-4" long. Includes metal cap on top <br />(includes credit for steel guard rail, steel hand rail still required) <br />• Alternate #4 add $ 6,938.00 <br />HVAC screen wall brick veneer <br />Install 1/2" treated plywood sheathing over existing siding on HVAC screen <br />wall on one side only (side facing the street), install thin brick veneer over <br />new plywood sheathing. Install cap flashing over top of entire wall <br />• Alternate #5 add $ 350.00 <br />Insulation <br />batt insulation to stop cold air filtration at front counter <br />• Alternate #6 <br />Floor tile <br />Option a) <br />Lobby, hallway & corridor add $ 11,999.00 <br />Remove carpet & carpet base, grind concrete floor, remove <br />& replace wood subfloor in front of counter to create level floor, <br />install 12 "x12" floor tile (back bay program brand) with 3 "x12" base <br />(includes floor transitions, floor prep to be done at night) <br />Option b) <br />Vestibule add $ 5,396.00 <br />Remove quarry tile floor, grind concrete floor, <br />install 12 "x12" floor tile (back bay program brand) with 3"x12" base <br />(includes floor transitions, floor demolition & floor prep to be done at night) <br />75 W. Viking Drive Suite 104 • Little Canada, Minneb: 2 ;,117 = Phone (651) 484 -5635 a Fax (651) 484 -5701 <br />
The URL can be used to link to this page
Your browser does not support the video tag.