55 2506.522 INSTALL NEW FRAME AND RING CASTING EACH 6.00 5650.00 0.00 50.00 6.00 53900.00
<br />56 2506.602 RECONSTRUCT DRAINAGE STRUCTURE EACH 2.00 5800.00 0.00 50.00 1.00 5800.00
<br />57 2511.502 RANDOM RIP RAP CL IV TONS 55.00 555,00 000 5000 33.56 $1,845.80
<br />58 2521.501 4" CONCRETE WALK SF 24,300.00 32.81 0.00 5000 22.66826 863,683.76
<br />59 2521.511 2" BITUMINOUS WALK SF 2.40000 51.70 0.00 30.00 3,630.00 56,171.00
<br />60 2531.501 8618 CURB AND GUTTER LF 8,100.00 37.90 0.00 30.00 8,93600 570,594,40
<br />61 2531.507 6" CONCRETE DRIVEWAY PAVEMENT SY 210.00 538.00 62.50 52,375.00 375.50 314,269.00
<br />62 2531.602 CONCRETE PEDESTRIAN RAMP EACH 16.00 5400,00 0.00 50.00 20.00 58900.00
<br />63 2540.602 NSTALL SALVAGED MAILBOX EACH 3.00 $70.00 0.00 50.00 3.00 5210.00
<br />64 2540.602 NSTALL SALVAGED GUARD POST EACH 5.00 3250.00 0.00 $0.00 0.00 $0,00
<br />65 2540602 NSTALL SALVAGED FLAG POLE EACH 2.00 3300.00 0.00 50.00 2.00 5600.00
<br />66 2540602 NSTALL SALVAGED SIGN EACH 2.00 $95.00 0.00 50.00 2.00 5190.00
<br />67 2540.603 NSTALL SALVAGED RETAINING WALL LE 10.00 575.00 0.00 50.00 17.00 51,275.00
<br />68 2540.603 NSTALL SALVAGED FENCE LF 20.00 520,00 0.00 $0.00 15.00 S300.00
<br />69 2557.501 WIRE FENCE DESIGN 60 -9322 LF 1,700.00 59.66 0.00 50.00 1,365.00 513,185.90
<br />70 2563,601 RAFFIC CONTROL LS 1,00 34,900.00 0.00 50.00 1.00 54,900.00
<br />71 2564.536 URNISH AND INSTALL SIGN EACH 51.00 5137.25 0.00 50.00 53.00 $7.274,25
<br />72 2564.602 AVEMENT MESSAGE (LEFT ARROW) - EPDXY EACH 52.00 555.00 0.00 30,00 48.00 $2,640.00
<br />73 2564.602 AVEMENT MESSAGE (RIGHT ARROW) - EPDXY EACH 2.00 355.00 0.00 $0.00 2.00 5110.00
<br />74 2564.602 AVEMENT MESSAGE (THRU ARROV) -EPDXY EACH 2.00 555.00 0.00 50.00 2.00 5110.00
<br />75 2564602 AVEMENT MESSAGE (RIGHT - THRU ARROW) - EPDXY EACH 2.00 590.00 0.00 50.00 0.00 50.00
<br />76 2564.602 AVEMENT MESSAGE (RR CROSSING) - EPDXY EACH 2.00 3295.00 0.00 30.00 2.00 5590,00
<br />77 2564.603 " DOUBLE SOLID LINE YELLOW -EPDXY LF 560.00 50.58 0.00 50.00 432.00 $250.56
<br />78 2564.603 ' SOLID LINE WHITE -EPDXY LF 650.00 50.38 000 50.00 433.00 5164.54
<br />79 2564.603 " SKIP LINE YELLOW -EPDXY LF 1,460.00 50.29 0.00 50.00 1,330.00 5385.70
<br />80 2564603 ' SOLID LINE YELLOW -EPDXY LF 7,160,00 50.29 000 50.00 6,802.00 51,972.58
<br />81 2564.603 4" STOP LINE WHITE - EPDXY LF 116.00 53.75 0.00 50.00 51,00 5191.25
<br />82 2564.603 " DOUBLE SOLID LINE YELLOW -PAINT LF 560,00 50.48 0.00 50.00 513.00 5246.24
<br />83 2564.603 " SOLID LINE WHITE -PAINT LF 650.00 50.23 0.00 50.00 470.00 5108.10
<br />84 2564.603 " SKIP LINE YELLOW -PAINT LF 1,460.00 $0.24 0.00 50.00 1,440.00 $345.60
<br />85 2564.603 " SOLID LINE YELLOW -PAINT LF 7,160.00 50.24 0.00 50.00 7,100.00 51,704.00
<br />86 2564.603 4' STOP LINE WHITE - PAINT LF 116.00 5278 0.00 50.00 88.00 5239.08
<br />87 2565.602 00P DETECTOR EACH 15.00 5775,00 0.00 5000 17.00 $13,175.00
<br />88 2565.602 ANOHOLE EACH 4.00 5650.00 0.00 50.00 300 51,950.00
<br />89 2565.603 ON- METALLIC CONDUIT LF 300.00 52.95 0.00 50.00 300.00 5085.00
<br />90 2573.502 ILT FENCE TYPE MACHINE SLICED LF 2,775.00 51.75 0.00 50.00 100.00 5175.00
<br />91 2573.530 I LET PROTECTION EACH 50.00 5100.00 0.00 50.00 42.00 54,200.00
<br />92 2564602 P LY PREFORM CROSS WALK SF 18000 518.06 0.00 5000 180.00 53,250.80
<br />5 HEDULE5.0- COUNTY ROAD B2- -TOTAL
<br />52,375.00 51.12269364
<br />SCHEDULE 6.0- CHANGE ORDER NI
<br />1 SPEC TWO ADDITIONAL CATCHBASINS ON NOEL DRIVE LS 1.00 54,234.58 0.00 50.00 1.00 54.234,58
<br />2 SPEC ADDITION OF YARD INLET ON CARLA LANE LS 1.00 53,345.00 0.00 50.00 1.00 $3,345.00
<br />3 SPEC SCHOOL FENCE ADDITIONS LS 1.00 55,509.35 0.00 50.00 1.00 $5,509.35
<br />4 SPEC WALL / PLANTER MODIFICATIONS AT GERVAIS MILL PARK LS 1.00 51,430.00 0.00 50.00 1.00 51430.00
<br />5 SPEC CHANGE T044' X 27' ARCH OUTLET PIPE ON CTY. RD. 82 LS 1.00 518057.64 0.00 50.00 1.00 518,057.64
<br />SCHEDULE 6,0- CHANGE ORDER 01 »TOTAL
<br />50.00 532,576.57
<br />SCHEDULE 7.0- CHANGE ORDER 02
<br />1 2564602 PAVEMENT MESSAGE (LEFT ARROW) - PAINT EACH 19.00 545.00 19.00 5855.00 19.00 5855,00
<br />2 2564.602 PAVEMENT MESSAGE (RIGHTARROVV) - PAINT EACH 1.00 $45.00 1.00 545,00 1.00 545,00
<br />3 2564.602 PAVEMENT MESSAGE (THRUARROW) - PAINT EACH 1.00 545.00 1.00 545,00 1.00 545.00
<br />4 2564.602 PAVEMENT MESSAGE (RIGHT - THRU ARROW) - PAINT EACH 2.00 545.00 2.00 590.00 2.00 590.00
<br />5 SPEC INSULATION OF WATERTOWER LEAD SY 19.23 528.34 19.23 5544.98 19.23 5544.98
<br />6 SPEC CLEAN OUT COVERS EACH 3.00 575.00 3.00 5225.00 3.00 5225.00
<br />O0Pto4616600 .110071 /Pmtial Payments /Pay Estimate 09 Final (2005 Project) 4
<br />-5
<br />CONTRACT ITEMS
<br />THIS PERIOD
<br />TOTAL TO DATE
<br />ITEM
<br />SPEC.
<br />N0.
<br />REF.
<br />DESCRIPTION
<br />UNIT
<br />QTY.
<br />UNIT
<br />QTY.. AMOUNT
<br />QTY. AMOUNT
<br />PRICE
<br />55 2506.522 INSTALL NEW FRAME AND RING CASTING EACH 6.00 5650.00 0.00 50.00 6.00 53900.00
<br />56 2506.602 RECONSTRUCT DRAINAGE STRUCTURE EACH 2.00 5800.00 0.00 50.00 1.00 5800.00
<br />57 2511.502 RANDOM RIP RAP CL IV TONS 55.00 555,00 000 5000 33.56 $1,845.80
<br />58 2521.501 4" CONCRETE WALK SF 24,300.00 32.81 0.00 5000 22.66826 863,683.76
<br />59 2521.511 2" BITUMINOUS WALK SF 2.40000 51.70 0.00 30.00 3,630.00 56,171.00
<br />60 2531.501 8618 CURB AND GUTTER LF 8,100.00 37.90 0.00 30.00 8,93600 570,594,40
<br />61 2531.507 6" CONCRETE DRIVEWAY PAVEMENT SY 210.00 538.00 62.50 52,375.00 375.50 314,269.00
<br />62 2531.602 CONCRETE PEDESTRIAN RAMP EACH 16.00 5400,00 0.00 50.00 20.00 58900.00
<br />63 2540.602 NSTALL SALVAGED MAILBOX EACH 3.00 $70.00 0.00 50.00 3.00 5210.00
<br />64 2540.602 NSTALL SALVAGED GUARD POST EACH 5.00 3250.00 0.00 $0.00 0.00 $0,00
<br />65 2540602 NSTALL SALVAGED FLAG POLE EACH 2.00 3300.00 0.00 50.00 2.00 5600.00
<br />66 2540602 NSTALL SALVAGED SIGN EACH 2.00 $95.00 0.00 50.00 2.00 5190.00
<br />67 2540.603 NSTALL SALVAGED RETAINING WALL LE 10.00 575.00 0.00 50.00 17.00 51,275.00
<br />68 2540.603 NSTALL SALVAGED FENCE LF 20.00 520,00 0.00 $0.00 15.00 S300.00
<br />69 2557.501 WIRE FENCE DESIGN 60 -9322 LF 1,700.00 59.66 0.00 50.00 1,365.00 513,185.90
<br />70 2563,601 RAFFIC CONTROL LS 1,00 34,900.00 0.00 50.00 1.00 54,900.00
<br />71 2564.536 URNISH AND INSTALL SIGN EACH 51.00 5137.25 0.00 50.00 53.00 $7.274,25
<br />72 2564.602 AVEMENT MESSAGE (LEFT ARROW) - EPDXY EACH 52.00 555.00 0.00 30,00 48.00 $2,640.00
<br />73 2564.602 AVEMENT MESSAGE (RIGHT ARROW) - EPDXY EACH 2.00 355.00 0.00 $0.00 2.00 5110.00
<br />74 2564.602 AVEMENT MESSAGE (THRU ARROV) -EPDXY EACH 2.00 555.00 0.00 50.00 2.00 5110.00
<br />75 2564602 AVEMENT MESSAGE (RIGHT - THRU ARROW) - EPDXY EACH 2.00 590.00 0.00 50.00 0.00 50.00
<br />76 2564.602 AVEMENT MESSAGE (RR CROSSING) - EPDXY EACH 2.00 3295.00 0.00 30.00 2.00 5590,00
<br />77 2564.603 " DOUBLE SOLID LINE YELLOW -EPDXY LF 560.00 50.58 0.00 50.00 432.00 $250.56
<br />78 2564.603 ' SOLID LINE WHITE -EPDXY LF 650.00 50.38 000 50.00 433.00 5164.54
<br />79 2564.603 " SKIP LINE YELLOW -EPDXY LF 1,460.00 50.29 0.00 50.00 1,330.00 5385.70
<br />80 2564603 ' SOLID LINE YELLOW -EPDXY LF 7,160,00 50.29 000 50.00 6,802.00 51,972.58
<br />81 2564.603 4" STOP LINE WHITE - EPDXY LF 116.00 53.75 0.00 50.00 51,00 5191.25
<br />82 2564.603 " DOUBLE SOLID LINE YELLOW -PAINT LF 560,00 50.48 0.00 50.00 513.00 5246.24
<br />83 2564.603 " SOLID LINE WHITE -PAINT LF 650.00 50.23 0.00 50.00 470.00 5108.10
<br />84 2564.603 " SKIP LINE YELLOW -PAINT LF 1,460.00 $0.24 0.00 50.00 1,440.00 $345.60
<br />85 2564.603 " SOLID LINE YELLOW -PAINT LF 7,160.00 50.24 0.00 50.00 7,100.00 51,704.00
<br />86 2564.603 4' STOP LINE WHITE - PAINT LF 116.00 5278 0.00 50.00 88.00 5239.08
<br />87 2565.602 00P DETECTOR EACH 15.00 5775,00 0.00 5000 17.00 $13,175.00
<br />88 2565.602 ANOHOLE EACH 4.00 5650.00 0.00 50.00 300 51,950.00
<br />89 2565.603 ON- METALLIC CONDUIT LF 300.00 52.95 0.00 50.00 300.00 5085.00
<br />90 2573.502 ILT FENCE TYPE MACHINE SLICED LF 2,775.00 51.75 0.00 50.00 100.00 5175.00
<br />91 2573.530 I LET PROTECTION EACH 50.00 5100.00 0.00 50.00 42.00 54,200.00
<br />92 2564602 P LY PREFORM CROSS WALK SF 18000 518.06 0.00 5000 180.00 53,250.80
<br />5 HEDULE5.0- COUNTY ROAD B2- -TOTAL
<br />52,375.00 51.12269364
<br />SCHEDULE 6.0- CHANGE ORDER NI
<br />1 SPEC TWO ADDITIONAL CATCHBASINS ON NOEL DRIVE LS 1.00 54,234.58 0.00 50.00 1.00 54.234,58
<br />2 SPEC ADDITION OF YARD INLET ON CARLA LANE LS 1.00 53,345.00 0.00 50.00 1.00 $3,345.00
<br />3 SPEC SCHOOL FENCE ADDITIONS LS 1.00 55,509.35 0.00 50.00 1.00 $5,509.35
<br />4 SPEC WALL / PLANTER MODIFICATIONS AT GERVAIS MILL PARK LS 1.00 51,430.00 0.00 50.00 1.00 51430.00
<br />5 SPEC CHANGE T044' X 27' ARCH OUTLET PIPE ON CTY. RD. 82 LS 1.00 518057.64 0.00 50.00 1.00 518,057.64
<br />SCHEDULE 6,0- CHANGE ORDER 01 »TOTAL
<br />50.00 532,576.57
<br />SCHEDULE 7.0- CHANGE ORDER 02
<br />1 2564602 PAVEMENT MESSAGE (LEFT ARROW) - PAINT EACH 19.00 545.00 19.00 5855.00 19.00 5855,00
<br />2 2564.602 PAVEMENT MESSAGE (RIGHTARROVV) - PAINT EACH 1.00 $45.00 1.00 545,00 1.00 545,00
<br />3 2564.602 PAVEMENT MESSAGE (THRUARROW) - PAINT EACH 1.00 545.00 1.00 545,00 1.00 545.00
<br />4 2564.602 PAVEMENT MESSAGE (RIGHT - THRU ARROW) - PAINT EACH 2.00 545.00 2.00 590.00 2.00 590.00
<br />5 SPEC INSULATION OF WATERTOWER LEAD SY 19.23 528.34 19.23 5544.98 19.23 5544.98
<br />6 SPEC CLEAN OUT COVERS EACH 3.00 575.00 3.00 5225.00 3.00 5225.00
<br />O0Pto4616600 .110071 /Pmtial Payments /Pay Estimate 09 Final (2005 Project) 4
<br />-5
<br />
|